County Permit SearchU.S. compliance directory
FloridaMiami-Dade County

Administrative overview · FIPS 12086

Miami-Dade County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

Municipal Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Miami-Dade County Department of Regulatory and Economic Resources, Building Services (unincorporated Miami-Dade and county reviews)

For a project in or near Miami-Dade County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(786) 315-2000; Regulatory and Economic Resources (305) 375-2877

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Herbert S. Saffir Permitting and Inspection Center, 11805 SW 26 Street, Miami, FL 33175

Operating hours

Operating hours not verified

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Miami-Dade County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (786) 315-2000; Regulatory and Economic Resources (305) 375-2877.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Use the county online services page to schedule, cancel, and track inspections; requests require the permit number and three-digit inspection code. Same-day cancellations are available online from 6:00 AM to 8:00 AM.

Which codes and exemptions should I review?

Florida Building Code, Eighth Edition (2023), Miami-Dade County Code Chapter 8, and applicable High-Velocity Hurricane Zone requirements and county environmental reviews Miami-Dade's exemption page states exemptions apply only to Florida Building Code requirements and other county or state approvals may still be required. The county provides exemption requests and lists common minor-repair and homeowner forms in its official forms library; project-specific eligibility must be checked there.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?