Administrative overview · FIPS 12035
Flagler County permit authority
The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.
Jurisdictional status
Municipal Fallback
This profile identifies a handoff outside the county’s ordinary structural permitting lane.
Required jurisdiction check
Confirm the controlling local or state authority before filing.
The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.
Responsible agency
Flagler County Growth Management Department, Building and Inspections/Central Permitting
For a project in or near Flagler County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.
Direct contact
(386) 313-4003; Chief Building Official (386) 313-4027; contractor licensing (386) 313-4076
Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.
Permit counter
1769 E. Moody Boulevard, Building 2, Bunnell, FL 32110
Operating hours
Monday-Friday, 8:00 AM-4:30 PM
Review expectation
Ask the agency for its current review estimate
Compliance workbench
Choose the next project decision.
Apply online
Open the verified digital gateway, application form, and review timeline.
Open guide →Fees & penalties
Understand fee schedules, enforcement exposure, and stop-work liabilities.
Open guide →Codes & exemptions
Read the code framework, minor-work exemptions, and inspection lane.
Open guide →Agency website
Visit the primary public source for current notices and contact changes.
Open guide →Source trail
Official sources for this profile
Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.
Project questions
Frequently asked questions for Flagler County
Who handles permitting for this jurisdiction?
This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.
How should I begin an application?
Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (386) 313-4003; Chief Building Official (386) 313-4027; contractor licensing (386) 313-4076.
How long might review take?
A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.
How are inspections scheduled?
Use the county Central Permitting portal to submit applications, check status, and schedule building inspections, or call (386) 313-4003. The county building page directs applicants to the portal and maintains required inspection records; contact Central Permitting for project-specific timing.
Which codes and exemptions should I review?
2023 Florida Building Code, Eighth Edition, and the 2020 National Electrical Code, together with Flagler County zoning, floodplain, wind, land-development, and other applicable ordinances. Flagler’s 2026 shed policy requires permits for accessory structures over 60 square feet and/or 6 feet high. Certain 61-100 square-foot prefabricated sheds not constructed on site may receive a tie-down permit, but setbacks, easements, flood provisions, and tie-down requirements still apply; built sheds in that size range must meet adopted code or engineering criteria. Sheds/accessory structures 101 square feet or greater require code-based design and planning/development-engineering review.