County Permit SearchU.S. compliance directory
FloridaBradford County

Administrative overview · FIPS 12007

Bradford County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Bradford County Building, Zoning & Fire Prevention Department

For a project in or near Bradford County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(904) 966-6223; inspections extension 1; Building Official/department extension 2

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Bradford County Courthouse, North Wing, 945 N. Temple Avenue, Starke, FL 32091

Operating hours

Monday-Thursday 8:00 AM-4:30 PM, closed 12:00-12:30 for lunch; Friday 8:00 AM-1:30 PM

Review expectation

Usually 7-10 business days after a complete application with all required documents; the county FAQ says the Building Official may take up to 30 days for a new-home plan review and must report deficiencies within 10 days.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Bradford County

Who handles permitting for this jurisdiction?

Bradford County Building, Zoning & Fire Prevention Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (904) 966-6223; inspections extension 1; Building Official/department extension 2.

How long might review take?

Usually 7-10 business days after a complete application with all required documents; the county FAQ says the Building Official may take up to 30 days for a new-home plan review and must report deficiencies within 10 days.

How are inspections scheduled?

Schedule online through the Bradford iWorQ portal or call (904) 966-6223 extension 1. Requests should be made at least one business day before the inspection and before 4:30 PM; later calls move the inspection to two days out. Leave the name, permit number, inspection type, and callback number. Inspections generally run 8:30 AM-5:00 PM weekdays, with no guaranteed exact arrival time. A recorded Notice of Commencement is required for permitted work over $5,000, except qualifying HVAC work under $15,000.

Which codes and exemptions should I review?

2023 Florida Building Code, Eighth Edition, as the current statewide code administered by Bradford County, together with applicable Florida Fire Prevention Code and county land-development/zoning regulations. Municipal jurisdictions may differ: Starke properties or properties served by Starke utilities are directed to the City of Starke, and Lawtey, Brooker, and Hampton have local zoning departments. Bradford’s FAQ lists statutory exemptions for federally regulated structures, railroads, qualifying nonresidential farm buildings with the required agricultural exemption, temporary construction buildings or sheds, qualifying temporary mobile/modular offices, utility facilities, temporary production structures, tribal chickees, and certain prefabricated family mausoleums. Owner-builders may perform qualifying work on their own occupied property; fences under 8 feet do not require a building permit under the county FAQ, although zoning rules still apply. Cosmetic work is exempt only where covered by the Florida Building Code’s applicable exemption provisions.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?