County Permit SearchU.S. compliance directory
ArkansasPulaski County

Administrative overview · FIPS 05119

Pulaski County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Pulaski County Planning and Development Department; the county administers planning, subdivision, floodplain, stormwater, and Lake Maumelle Watershed registration/building permits in its jurisdiction, while incorporated cities administer building permits within their own limits

For a project in or near Pulaski County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

501-340-8260 (Planning and Development); 501-340-8265 (Plans Review Coordinator); 501-340-8305 (County Judge Barry Hyde)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Pulaski County Planning and Development, 3200 Brown Street, Little Rock, AR 72204; Pulaski County Government, 201 S. Broadway, Suite 400, Little Rock, AR 72201

Operating hours

N/A. The reviewed official Planning and Development page publishes department contacts but no public operating hours.

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Pulaski County

Who handles permitting for this jurisdiction?

Pulaski County Planning and Development Department; the county administers planning, subdivision, floodplain, stormwater, and Lake Maumelle Watershed registration/building permits in its jurisdiction, while incorporated cities administer building permits within their own limits is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 501-340-8260 (Planning and Development); 501-340-8265 (Plans Review Coordinator); 501-340-8305 (County Judge Barry Hyde) and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Contact Pulaski County Planning and Development at 501-340-8260 for floodplain development, permits, and fees. The Lake Maumelle Watershed Inspector is listed as David Main at 501-340-6881; no separate public inspection-booking workflow was published.

Which codes and exemptions should I review?

Pulaski County Subdivision and Development Code (September 29, 2022, Ordinance 22-OR-35), Lake Maumelle Watershed zoning and land-use regulations, and county floodplain/stormwater regulations; exact 2026 building-code editions were not identified. The Lake Maumelle Watershed building-permit form includes exemption-square-footage fields, and the county subdivision code allows a family-member exclusion subject to recorded documentation and transfer restrictions; a complete minor/cosmetic building-work exemption list was not published.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?