County Permit SearchU.S. compliance directory
AlabamaWinston County

Administrative overview · FIPS 01133

Winston County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

Municipal Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Winston County Commission / City of Haleyville Building Permit Authority (municipal fallback)

For a project in or near Winston County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

205-489-5026 (Winston County Commission); 205-486-3121 (City of Haleyville City Hall)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Winston County Commission, 11 Blake Drive, Room 11, Double Springs, AL 35553; City of Haleyville City Hall, 911 21st Street, Haleyville, AL 35565.

Operating hours

Winston County courthouse offices generally Monday-Friday, 8:00 AM-4:30 PM. Double Springs Town Hall is listed as Monday-Friday, 8:00 AM-4:30 PM; Haleyville City Hall hours were not separately published on the reviewed permit page.

Review expectation

N/A. Haleyville’s ordinance states that plans must be reviewed before permit issuance but does not publish a standard review duration.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Winston County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 205-489-5026 (Winston County Commission); 205-486-3121 (City of Haleyville City Hall) and request the current application route before preparing a final submittal.

How long might review take?

N/A. Haleyville’s ordinance states that plans must be reviewed before permit issuance but does not publish a standard review duration.

How are inspections scheduled?

Haleyville’s zoning ordinance requires the City Clerk or designated official to make a final inspection within three days after the owner or agent reports that the building is ready for occupancy or use. No countywide inspection-request portal was located. Double Springs directs general municipal inquiries to its Town Clerk at 205-489-5447.

Which codes and exemptions should I review?

N/A for a countywide code edition. The reviewed county channels did not publish a county building-code or permit program. Haleyville’s official zoning ordinance requires construction to comply with the city’s building code and other city ordinances, and its application identifies the City of Haleyville as the permitting authority. N/A. The accessible Haleyville ordinance and permit form do not provide a concise general list of minor/cosmetic exemptions; applicants must verify the project scope with the municipal permitting office.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?