Administrative overview · FIPS 01001
Autauga County permit authority
The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.
Jurisdictional status
Municipal Fallback
This profile identifies a handoff outside the county’s ordinary structural permitting lane.
Required jurisdiction check
Confirm the controlling local or state authority before filing.
The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.
Responsible agency
Autauga County Engineering Department
For a project in or near Autauga County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.
Direct contact
(334) 361-3761
Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.
Permit counter
511 West Fourth Street, Prattville, AL 36067
Operating hours
Monday-Friday, 6:00 AM-4:30 PM Central Time, excluding holidays
Review expectation
Ask the agency for its current review estimate
Compliance workbench
Choose the next project decision.
Apply online
Open the verified digital gateway, application form, and review timeline.
Open guide →Fees & penalties
Understand fee schedules, enforcement exposure, and stop-work liabilities.
Open guide →Codes & exemptions
Read the code framework, minor-work exemptions, and inspection lane.
Open guide →Agency website
Visit the primary public source for current notices and contact changes.
Open guide →Source trail
Official sources for this profile
Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.
Project questions
Frequently asked questions for Autauga County
Who handles permitting for this jurisdiction?
This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.
How should I begin an application?
No verified online portal was located in the reviewed public materials. Contact (334) 361-3761 and request the current application route before preparing a final submittal.
How long might review take?
A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.
How are inspections scheduled?
Call the Autauga County Engineer's Office at (334) 361-3761 before building. A final inspection is required after a flood-zone structure is complete and ready for occupancy; no online scheduling process was identified.
Which codes and exemptions should I review?
Autauga County Flood Damage Prevention Ordinance and NFIP/FEMA floodplain requirements; no countywide 2026 building-code edition was identified on the official county site. N/A — no official minor/cosmetic exemption list was found. In the Special Flood Hazard Area, the county defines development broadly to include new construction, mobile homes and RVs, additions, remodeling, alterations, excavations, sheds and pole barns.