Who issues permits

Crawford County Land Conservation is the county office listed for building permits in Crawford County.

Also listed: Planning & Zoning Department - Sanitation & Zoning.

How to get a permit in Crawford County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Fill in the application from crawfordcountywi.gov and submit it as the form directs.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Search Crawford County permit records

No online permit portal is listed, so permit history is kept by Crawford County Land Conservation. Call 608-326-0294 with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Crawford County Land Conservation publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

Crawford County is not comprehensively zoned. In unincorporated areas the county administers Code Chapter 16 Shoreland-Wetland Zoning (updated December 16, 2025), Chapter 20 Floodplain Zoning, and Chapter 15 Private Onsite Wastewater Treatment Systems, including Wisconsin Administrative Code SPS 383 requirements. Towns issue separate site and building permits and administer applicable Wisconsin Uniform Dwelling Code requirements; cities and villages administer permits independently.

Wisconsin: statewide code. Details

Work that may not need a permit

Because county zoning is limited, work outside mapped floodplain and shoreland jurisdiction generally does not need a county zoning permit, though town or municipal permits may apply. Within shoreland-wetlands, listed low-impact activities requiring no zoning permit include hiking, fishing, hunting, swimming, boating, wild-crop harvesting, livestock pasturing and fence maintenance, crop cultivation, silviculture, and duck blinds when performed without filling, draining, dredging, ditching, tiling, or excavation. Routine vegetation maintenance involving no earth disturbance is allowed; verify every project with the county before work.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Call Sanitation & Zoning at 608-326-0294. The county performs inspections of permitted shoreland work; for POWTS installation, the licensed plumber coordinates with the county and schedules the installation inspection. Contact the town's UDC building inspector separately for building inspections.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

The February 2025 fee schedule charges double regular fees for a first after-the-fact permit, triple fees for a second offense, and triple fees plus a citation for a third offense; offenses follow the property owner and clear after 36 months without another offense. Chapter 16 also authorizes written violation notices, permit suspension, injunction and abatement, and forfeitures of $10-$200 per offense plus taxable costs, with each day a separate offense.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office at 608-326-0294 about:

  • Review times: how long plan review currently takes.

Wisconsin rules that apply in Crawford County

These rules come from Wisconsin law and state agencies, so they apply in Crawford County on top of anything the local office requires.

Building code

Statewide code

The Uniform Dwelling Code (Wis. Admin. Code chs. SPS 320–325) is a statewide code for one- and two-family homes, including modular and manufactured home installations. It has applied since June 1, 1980, and it is Wisconsin's own code, not the IRC.

Read more

Local ordinances may not differ from it (Wis. Stat. § 101.65(1c)). Its energy rules have been based on the 2009 IECC since January 1, 2016. In 2026 the UDC Council recommended moving to the 2024 IRC, but that change has not been adopted. The Commercial Building Code (SPS 361–366) covers public buildings, places of employment and buildings with three or more units. It adopts the 2021 IBC, IECC, IMC, IFGC and IEBC with Wisconsin changes, took effect September 1, 2025, and has been required for plans submitted on or after November 1, 2025. The Wisconsin Electrical Code (SPS 316) adopts the 2023 NEC and took effect September 1, 2026, replacing the 2017 NEC. An update to the Wisconsin Plumbing Code (SPS 381–387) also took effect on that date.

Wisconsin Department of Safety and Professional Services (DSPS), Division of Industry Services ↗

Outside city limits

All land in Wisconsin is in a city, village or town. Rural areas are governed by towns, not left unincorporated. A city, village or town may enforce the UDC by ordinance, alone or jointly with neighbors. Where it hasn't, a county UDC ordinance applies if the county has one (Wis. Stat. § 101.65(1)(a)).

Read more

If no local unit has authority, you apply for the UDC permit to DSPS through its eSLA system, and a DSPS-appointed inspector for your county does the inspections. Smaller municipalities of 2,500 people or less must enforce the UDC, ask the county to, or have DSPS enforce it (§ 101.651). DSPS keeps a delegated agent list and an inspector look-up tool to show who covers your address.

Contractor and trade licensing

Wisconsin has no general contractor license for all construction. Anyone who pulls a building permit for a one- or two-family home must hold a Dwelling Contractor certification (for the business) and hold, or employ, a Dwelling Contractor Qualifier (an individual).

Read more

The Dwelling Contractor needs a surety bond of at least $25,000 or general liability insurance of at least $250,000 per occurrence. A restricted certification allows a bond of $5,000 to under $25,000, but limits the contractor to jobs costing no more than the bond (Wis. Stat. § 101.654(2m)). The Qualifier needs 12 hours of continuing education every 2 years (Wis. Stat. § 101.654). These rules do not apply to an owner who lives in the home, or will live there, and applies for a permit for work on it (§ 101.654(1)(b)). When an owner pulls the permit, the municipality must have them sign a statement warning that hiring an uninsured or unbonded contractor may leave them liable (§ 101.65(1r)).

Electrical, plumbing and HVAC

DSPS licenses electricians (registered, journeyman, master and residential classes) and electrical contractors. It also licenses plumbers (journeyman, master and restricted classes) and UDC inspectors.

Read more

Electrical work requires a state license or registration, but a homeowner may install, repair or maintain wiring in a home they own and live in, unless a local ordinance requires a license (Wis. Stat. § 101.862(4)(a)). Plumbing licensing does not apply to a property owner working in a one-family building they own and occupy as their home, except where a local ordinance requires a license (§ 145.06(4)(a)). DSPS issues commercial electrical permits where the municipality lacks authority, and it does not issue plumbing permits. Plumbing permits come from the municipality, sometimes after a state plan review.

State programs that can affect your permit

Private onsite wastewater treatment systems (POWTS)

Septic systems follow state rules (SPS 383–385). Permits come from your county or municipality, and some designs need DSPS plan review first. A simple gravity system for one home that uses an approved component manual is reviewed locally. Installation must be inspected.

Official page: dsps.wi.gov ↗

State electrical permits and inspections

DSPS runs electrical permitting and inspection, sometimes through contracted inspection agencies. A state commercial electrical permit is needed for new or added services, feeders or branch circuits serving farms, public buildings, places of employment, campgrounds, manufactured home communities and similar sites. Since the 2023 NEC update, it is also needed for vacant land or structures that don't already have a permit. Where your municipality has no delegated authority, apply through DSPS's eSLA system.

Official page: dsps.wi.gov ↗

Manufactured and modular homes

Manufactured home installations and modular dwellings fall under the UDC program and need a UDC permit like other new homes. DSPS also runs a manufactured home program.

Official page: dsps.wi.gov ↗

Verified October 28, 2026 against Wisconsin sources. Wisconsin permit rules, sources and other counties

Common projects in Crawford County

Wisconsin has statewide rules on file for 1 of these projects; they apply in Crawford County along with local permit requirements.

  • Electrical work

    A residential owner may install, repair or maintain electrical wiring in a home they own and live in without a state electrician license, unless a local ordinance requires one (Wis. Stat. § 101.862(4)(a)).

    Read more

    The work must follow the Wisconsin Electrical Code (2023 NEC, effective September 1, 2026), and local permit rules still apply.

    Wisconsin source: web.archive.org ↗ · Electrical work permit guide

Named in Crawford County’s exemption summary (read it before assuming the work is exempt): Fences · Floodplain development

Guides for other projects: Decks · Sheds and accessory buildings · Roof replacement · Water heaters · Heating and air conditioning · Rooftop solar · Pools and spas · Accessory dwelling units · All 21 project guides

Other permits you may need in Crawford County

These are separate from the building permit and come from the agencies named, under Wisconsin rules.

  • Septic system

    County (governmental unit) under DSPS rules

    Under SPS 383.21, a private onsite wastewater treatment system (POWTS) cannot be installed until the property owner has a sanitary permit from the county or other governmental unit and plan approval, and the permit expires after 2 years unless renewed.

    Read more

    The application needs plans signed by a registered POWTS designer, engineer or architect, or by the licensed master plumber responsible for the installation, plus a soil evaluation report signed by a certified soil tester. No part of the system may be covered or put into service until the county or DSPS has had a chance to inspect it.

    Official page: law.cornell.edu ↗ · Septic permit guide

  • Floodplain development

    Wisconsin DNR

    Counties, cities and villages must adopt floodplain ordinances that meet the minimums of ch. NR 116, and DNR reviews and approves them and coordinates FEMA approval for NFIP communities. Floodplain permits come from the local official, usually the zoning administrator.

    Read more

    The state model ordinance includes standards beyond NFIP minimums, such as prohibiting new residential, commercial or industrial structures in the floodway and requiring structures in the flood fringe to have the lowest floor elevated on fill two feet or more above the regional flood elevation.

    Official page: dnr.wisconsin.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    WisDOT

    WisDOT requires a connection permit for a driveway onto a state highway under Wis. Stat. s. 86.07(2)(a) and Trans 231, and there is no application fee. The same statute requires a permit from the maintaining authority for any work in a highway right-of-way, so for county highways, town roads or city streets, contact the county highway department, town or municipality.

    Official page: wisconsindot.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Wisconsin DNR

    Projects that will disturb one or more acres, counting the whole project and any common plan of development or sale, need coverage under DNR's construction site stormwater general permit (WPDES WI-S067831), applied for with a Notice of Intent at least 14 working days before construction.

    Read more

    The landowner must prepare an erosion control and stormwater management plan, inspect weekly, and file a Notice of Termination when done. For one- and two-family home sites under one acre, the Uniform Dwelling Code (SPS 321.125) still requires erosion and sediment control practices.

    Official page: dnr.wisconsin.gov ↗

  • Water well

    Wisconsin DNR

    Before a new private well is built, the owner or well constructor must obtain a DNR Well Construction Notification number; high capacity wells and reconstruction of existing wells are exempt from notification.

    Read more

    Wells must be built to NR 812 standards, DNR licenses well drillers and pump installers under NR 146, and a Well Construction Report must be submitted to DNR within 30 days, usually by the driller.

    Official page: dnr.wisconsin.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Crawford County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 608-326-0294 if you are unsure.

Can I apply for a permit online in Crawford County?

No online permit portal was found for this listing. The agency does publish application forms and a fee schedule online, which may need to be submitted by mail or in person. Contact the office at 608-326-0294 to ask how applications are accepted.

How much does a building permit cost in Crawford County?

Crawford County Land Conservation publishes its fee schedule online (crawfordcountywi.gov). Look up your project type there, and ask the office at 608-326-0294 for an estimate if your project is not listed.

How do I look up past permits for an address in Crawford County?

There is no online permit search for this listing. Ask the office at 608-326-0294 for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.

Can I check a contractor's license for work in Crawford County?

Yes, at license.wi.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Crawford County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Crawford County borders Grant County, Richland County, Vernon County, Allamakee County (Iowa), Clayton County (Iowa).