Who issues permits

No countywide building permit office was identified for Henry County. The listing points to Henry County Mayor’s Office for unincorporated areas. Inside city or town limits, the city or town issues building permits.

Applicable municipal building department, including City of Paris Building & Codes.

Outside city limits in Tennessee

It depends on the county. Some counties run their own building department and issue permits in unincorporated areas. In counties that have neither their own program nor an opt-out, a new home or an addition of 30 sq ft or more of interior space needs a state residential building permit.

Read more

The permit comes from a state-authorized issuing agent, and state deputy building inspectors do the inspections. Where the county has opted out, the unincorporated areas need no residential building permit (Rule 0780-02-23-.05). In most counties a state electrical permit is still required, and a septic system always needs a state permit.

More Tennessee rules below · Confirm with the office at 731-642-5212 before you build.

How to get a permit in Henry County

  1. Find the office for your address: the city or town if you are inside its limits; outside them, the Tennessee rule above decides.
  2. Apply online through the iWorQ portal at paristn.portal.iworq.net, or with the published application forms.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Search Henry County permit records

The listing’s online portal is at paristn.portal.iworq.net ↗ and runs on iWorQ. Look for its public search and try the property address, parcel number or permit number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Henry County Mayor’s Office for unincorporated areas at 731-642-5212. To follow your own application, search for its permit or application number.

Inside a city or town, permit records are kept by that municipality’s building department, not by Henry County.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Henry County Mayor’s Office for unincorporated areas publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

Henry County states that unincorporated areas have no local zoning regulations and do not require building permits; commercial businesses must follow Tennessee State Fire Codes, electrical connections require State Electrical Inspector inspection, and septic installations require Health Department soil testing. For the municipal fallback, City of Paris lists the 2018 International Building, Residential, Plumbing, Mechanical, Fuel Gas, Existing Building, Energy Conservation, and Property Maintenance Codes, plus 2018 NFPA Life Safety 101.

Tennessee: partial statewide code. Details

Work that may not need a permit

In unincorporated Henry County, the official county page says building permits are not required and there is no county zoning. Commercial businesses remain subject to Tennessee State Fire Codes; electrical and septic requirements still apply. Within municipalities, exemptions and permit thresholds vary and must be confirmed with the applicable city; the City of Paris packet does not publish a consolidated cosmetic-exemption list.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

For City of Paris projects, call Building & Codes at 731-641-1409 to schedule inspections; requests must be made by 3:00 p.m. the day before and are scheduled for the following business day. New construction generally has footing, slab/foundation, framing, and final inspections; remodels have pre-concealment and final inspections; mobile homes have footing and final inspections. Electrical work is inspected by the State, gas work requires a separate permit, and septic work requires Health Department soil testing. For unincorporated property, contact the County Mayor’s Office and relevant state inspectors before beginning work.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Not published online

We did not find these in the office’s online materials. Ask the office at 731-642-5212 about:

  • Review times: how long plan review currently takes. Not available countywide. City of Paris publishes next-business-day inspection scheduling when called by 3:00 p.m. the prior business day, but no general permit-review timeline.
  • Work without a permit: the penalty for starting work before a permit is issued. Not available for county building permits because Henry County states that unincorporated areas do not require building permits. The county page separately describes civil penalties for its garbage/litter/refuse resolution, not construction permits. Municipal penalties and stop-work consequences vary; confirm with the applicable city building official before work begins.

Tennessee rules that apply in Henry County

These rules come from Tennessee law and state agencies, so they apply in Henry County on top of anything the local office requires.

Building code

Partial statewide code

For one- and two-family homes and townhouses, the state residential code is the 2018 International Residential Code (IRC) with Tennessee amendments (Rule 0780-02-23-.02, last amended effective July 16, 2020). Fire sprinklers in homes are not required, and the IRC electrical chapters are replaced by the state electrical rules.

Read more

Energy work follows the 2018 IECC with amendments. For other buildings, a rule effective April 17, 2025 moved the state to the 2021 IBC, IFC, IPC, IMC, IFGC, IEBC and IECC (Rule 0780-02-02). Plans could use the older codes until August 15, 2025. The state electrical code is the 2017 National Electrical Code with Tennessee exceptions, effective October 1, 2018 (Rule 0780-02-01-.02). The state's own electrical program still listed the 2017 NEC as of August 2026. Local governments may enforce their own codes, but their codes must be no more than seven years older than the latest edition. They may not weaken the state standards without the State Fire Marshal's written approval. A city or county may also opt out of the state residential code by resolution (Rule 0780-02-23-.14). Where it does, no state residential building permit is required.

Tennessee Department of Commerce and Insurance, Division of Fire Prevention (State Fire Marshal's Office) ↗

Contractor and trade licensing

The Tennessee Board for Licensing Contractors licenses prime contractors for projects of $25,000 or more. Electrical, mechanical, plumbing, HVAC and roofing subcontractors need a license when their part of the job is $25,000 or more, and masonry subcontractors need one at $100,000 or more.

Read more

In Bradley, Davidson, Hamilton, Haywood, Knox, Marion, Robertson, Rutherford and Shelby counties, a home improvement license is also required for residential remodeling jobs from $3,000 to $24,999 (T.C.A. § 62-6-501 et seq.). Property owners building a home for their own use do not need a contractor license. In the state residential program, a property owner's permit is for an owner of record building a one-family home they plan to live in. Under T.C.A. § 62-6-103, an individual may get only one property owner's permit in any 24-month period. The owner does not need to show a license, but the work gets the same inspections (Rule 0780-02-23-.01, -.05). Local building departments set their own owner-permit rules.

Electrical, plumbing and HVAC

Electrical, plumbing and HVAC contractors are licensed by the Board for Licensing Contractors (the CE, CMC-A and CMC-C classifications) for jobs of $25,000 or more. For smaller jobs, the Board issues Limited Licensed Electrician (LLE) and Limited Licensed Plumber (LLP) licenses.

Read more

These are required in places that use the State Fire Marshal's Office for permits or inspections. Plumbing maintenance work under $500 is exempt from the LLP. Cities with their own programs may have local licensing instead. The State Fire Marshal's Office runs the state electrical permit and inspection program through about 100 contracted deputy electrical inspectors, and permits are sold online through the CORE system and by local issuing agents.

State programs that can affect your permit

State electrical inspection program

Outside the exempt jurisdictions, an electrical permit is required before installing wiring that must be inspected under Rule 0780-02-01-.04. Contracted deputy electrical inspectors do the inspections. The exempt jurisdictions are mostly larger cities (for example Knoxville, Chattanooga, Clarksville, Franklin and Murfreesboro), plus all of Davidson (Metro Nashville), Hamilton and Shelby counties. They run their own electrical permits.

Official page: tn.gov ↗

State residential building permit program

The same State Fire Marshal's section issues residential building permits and inspects new one- and two-family homes, townhouses and additions of 30 sq ft or more of interior space. It covers places that neither enforce their own residential code nor have opted out.

Official page: tn.gov ↗

Subsurface sewage disposal (septic) permits

Anyone installing a septic system, or repairing a failing one, needs a Septic System Construction Permit from TDEC's Division of Water Resources. Some contract counties (Blount, Davidson, Hamilton, Jefferson, Knox, Madison, Sevier, Shelby and Williamson) may require an extra local permit. A residential building permit application must certify that public sewer or a septic permit is available.

Official page: tn.gov ↗

Manufactured housing

The State Fire Marshal's Manufactured Housing Section licenses manufacturers, retailers and installers of HUD-labeled manufactured homes. It also inspects installations under the Tennessee Manufactured Home Installation Act. Setting a manufactured or modular home is not "construction" under the state residential code, but any added site-built construction is.

Official page: tn.gov ↗

Verified October 28, 2026 against Tennessee sources. Tennessee permit rules, sources and other counties

Common projects in Henry County

Tennessee has statewide rules on file for 3 of these projects; they apply in Henry County along with local permit requirements.

  • Decks

    Under the state residential program, decks, porches and other additions of exterior space, and additions of less than 30 sq ft of interior space, count as renovation, so no state residential building permit is needed (Rule 0780-02-23-.01). Local building departments may require one.

    Tennessee source: law.cornell.edu ↗ · Decks permit guide

  • Roof replacement

    Under the state residential program, reroofing and residing count as "renovation" rather than "construction," so they don't need a state residential building permit (Rule 0780-02-23-.01). Cities and counties with their own building departments may still require a permit.

    Tennessee source: law.cornell.edu ↗ · Roof replacement permit guide

  • Electrical work

    In areas served by the state electrical program, a permit is required before installing wiring that must be inspected under Rule 0780-02-01-.04. A residential property owner can buy an individual-use permit for a home that is not for sale, lease or rent, and doesn't need to show a license.

    Also named in Henry County’s exemption summary.

    Tennessee source: tn.gov ↗ · Electrical work permit guide

Named in Henry County’s exemption summary (read it before assuming the work is exempt): Septic systems

Guides for other projects: Fences · Sheds and accessory buildings · Water heaters · Heating and air conditioning · Rooftop solar · Pools and spas · Accessory dwelling units · Demolition · All 21 project guides

Other permits you may need in Henry County

These are separate from the building permit and come from the agencies named, under Tennessee rules.

  • Septic system

    Tennessee Department of Environment and Conservation (TDEC), Division of Water Resources

    No property owner or installer may build, alter, extend or repair a septic (subsurface sewage disposal) system without a valid construction permit from TDEC, and TDEC will not issue one where a public sewer is accessible (Rule 0400-48-01-.06).

    Read more

    The site must first be shown suitable through its soil conditions, absorption rates and depth to groundwater and rock, which TDEC may determine itself or with an approved soil consultant's map, and construction permits expire 3 years after issuance. Installers must hold an annual TDEC installer permit, except owners or tenants doing their own work on the home they live in, and before a new home gets electrical service the electrical inspector must see proof of a septic permit application or a public sewer connection.

    Official page: law.cornell.edu ↗ · Septic permit guide

  • Water well

    Tennessee Department of Environment and Conservation (TDEC), Division of Water Resources

    Before drilling a water well, the property owner or the licensed well driller must submit a Notice of Intent to TDEC, and the driller may not start without proof it was filed (Rule 0400-45-09-.10). The state Notice of Intent fee ($75 per property site for a water well) does not apply in local jurisdictions approved to regulate and inspect wells.

    Read more

    Each new well must carry a TDEC registration tag, and the licensed driller must file a well completion report (Report of Well Driller) with TDEC within 60 days after the well is completed.

    Official page: law.cornell.edu ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does Henry County have a countywide building permit office?

No, none was identified. For an address in a city or town, call that municipality's building department or city hall. For unincorporated land, Tennessee law decides whether a local permit is needed (see "Outside city limits" on this page), and state requirements such as electrical, plumbing, or septic rules can still apply.

Can I apply for a permit online in Henry County?

Yes. The listing includes an online permit portal at paristn.portal.iworq.net. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Henry County?

Henry County Mayor’s Office for unincorporated areas publishes its fee schedule online (paristn.gov). Look up your project type there, and ask the office at 731-642-5212 for an estimate if your project is not listed.

How do I look up past permits for an address in Henry County?

Start with the iWorQ portal at paristn.portal.iworq.net and search by address, parcel or permit number. If an older permit is not there, ask the office at 731-642-5212 for the file or send a public records request.

Can I check a contractor's license for work in Henry County?

Yes, at verify.tn.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Henry County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Henry County borders Benton County, Carroll County, Stewart County, Weakley County, Calloway County (Kentucky), Graves County (Kentucky).

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Henry County.