County Permit SearchU.S. compliance directory
TennesseeClay County

Administrative overview · FIPS 47027

Clay County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

Municipal Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Clay County Building Inspector

For a project in or near Clay County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

931-243-2165

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

112 W. Lake Avenue, Celina, TN 38551

Operating hours

Tuesday and Thursday, 8:00 a.m.-4:00 p.m.

Review expectation

N/A; no county review timeline was published.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Clay County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 931-243-2165 and request the current application route before preparing a final submittal.

How long might review take?

N/A; no county review timeline was published.

How are inspections scheduled?

Contact the Clay County Building Inspector at 931-243-2165 for inspection scheduling and requirements. The county’s June 2026 minutes refer to building-permit and inspection requirements and a stop-order enforcement process, but do not publish a booking URL or advance-notice rule.

Which codes and exemptions should I review?

N/A; the official county site does not publish the currently enforced code edition. A county commission agenda for August 10, 2026 lists a proposed resolution to opt out of statewide building-code standards for one- and two-family dwellings, so the applicable code status is in transition and should be confirmed with the Building Inspector. N/A; no current Clay County exemption list for minor or cosmetic work was published. Confirm whether a project needs a permit with the Building Inspector before starting.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?