County Permit SearchU.S. compliance directory
OhioMedina County

Administrative overview · FIPS 39103

Medina County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Medina County Building Department

For a project in or near Medina County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

330-722-9220; Chief Building Official 330-722-9221

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Permit Center, 791 W Smith Road, Medina, OH 44256

Operating hours

Monday-Friday 8:00 AM-4:30 PM; no permits issued after 4:00 PM; 2026 holiday closures are posted on the department page.

Review expectation

Residential plan review is currently shown in the department portal as approximately 14 calendar days; the commercial builder guide states a typical plan-review response of 18-22 days.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Medina County

Who handles permitting for this jurisdiction?

Medina County Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 330-722-9220; Chief Building Official 330-722-9221.

How long might review take?

Residential plan review is currently shown in the department portal as approximately 14 calendar days; the commercial builder guide states a typical plan-review response of 18-22 days.

How are inspections scheduled?

Schedule only by phone or through the inspection portal. Requests received before 3:00 PM on a business day are eligible for the next business day's schedule, although next-day service is not guaranteed. Call 330-722-9220 after 8:00 AM for an ETA; the route-sheet ETA is posted after 8:30 AM. Plumbing, septic, and well inspections are handled by Medina County Health Department at 330-723-9523.

Which codes and exemptions should I review?

2024 Ohio Building Code, current Residential Code of Ohio for one-, two-, and three-family residential work, and applicable current Ohio mechanical, electrical, plumbing, energy, and fire-protection requirements; the department links current construction codes and county regulations. Residential accessory buildings of 200 square feet or less do not require a building permit, although local zoning approval may still be required. A property owner may obtain permits for work on the owner's primary dwelling through a sworn homeowner affidavit, subject to statutory and safety limitations; this is not an exemption from required permits.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?