Who issues permits
No countywide building permit office was identified for Fulton County. The listing points to Fulton County Regional Planning Commission. Inside city or town limits, the city or town issues building permits.
Also listed: Wood County Building Inspection Department and local township authorities.
Outside city limits in Ohio
Cities, villages, townships and counties may each run a building department certified by the Board of Building Standards, so permits in unincorporated areas come from the county or township department if one is certified.
Read more
Certification can cover commercial work, residential work, or both. For commercial buildings, the Division of Industrial Compliance acts as the building official where no certified local department has jurisdiction. For homes, the RCO says that if no certified residential department has jurisdiction, owners do not need plan approval or inspections. The work must still meet the code. Septic systems, zoning and floodplain permits are separate and may still apply.
More Ohio rules below · Confirm with the office at 419-337-9214 before you build.
How to get a permit in Fulton County
- Find the office for your address: the city or town if you are inside its limits; outside them, the Ohio rule above decides.
- Apply online through the iWorQ portal at fultoncountyoh_permit.portal.iworq.net.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Search Fulton County permit records
The listing’s online portal is at fultoncountyoh_permit.portal.iworq.net ↗ and runs on iWorQ. Look for its public search and try the property address, parcel number or permit number.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Fulton County Regional Planning Commission at 419-337-9214. To follow your own application, search for its permit or application number.
Inside a city or town, permit records are kept by that municipality’s building department, not by Fulton County.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
Fulton County Regional Planning Commission publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
Ohio Building Code enforcement, plan review, and inspections for commercial and industrial work are performed through Wood County Building Inspection under Fulton County's agreement; zoning and development permits are administered by Fulton County or the applicable township.
Ohio: partial statewide code. Details
Scheduling inspections
Use the Fulton County permit portal for development and zoning submissions. Commercial and industrial building-code plans and inspections are handled through Wood County Building Inspection at 419-354-9190; local zoning approval may be required before building work.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
Fulton County publishes late filing fees for development permits, including $100 instead of $50 for many accessory or site permits and $200 instead of $100 for certain dwelling or manufactured-home permits. Building-code penalties are administered by Wood County or the responsible local authority.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Not published online
We did not find these in the office’s online materials. Ask the office at 419-337-9214 about:
- Exempt work: which minor work needs no permit. Not available as a countywide building-code exemption list. Fulton County publishes development and zoning permit categories for accessory buildings, decks, fences, pools, signs, dwellings, and commercial/industrial buildings; confirm requirements for the particular township or municipality.
- Review times: how long plan review currently takes.
Ohio rules that apply in Fulton County
These rules come from Ohio law and state agencies, so they apply in Fulton County on top of anything the local office requires.
Building code
Partial statewide code
The 2024 Ohio Building Code (2021 IBC with Ohio amendments), Ohio Mechanical Code and Ohio Plumbing Code took effect March 1, 2024, along with the Ohio Existing Building Code based on the 2021 IEBC. Commercial electrical work follows the 2023 NEC (NFPA 70) through OBC Chapter 27.
Read more
The Residential Code of Ohio covers one-, two- and three-family homes. It is the 2019 RCO, based on the 2018 IRC and effective July 1, 2019. Its electrical chapter was amended to adopt the 2023 NEC with Ohio changes, effective March 1, 2024, and the chapter was amended again effective April 15, 2024. Enforcement depends on local certification. If no certified residential department has jurisdiction, owners do not have to submit plans, get approvals, request inspections or get a certificate of occupancy under the RCO (RCO 101.5). In July 2026 the Board began taking stakeholder input on a five-year review of the RCO (Amendments Group 107). That review proposes ADU, tiny house and patio cover rules, but none of it had been adopted as of October 2026.
Ohio Board of Building Standards, Division of Industrial Compliance, Ohio Department of Commerce ↗
Contractor and trade licensing
Ohio has no statewide general contractor or residential contractor license. The Ohio Construction Industry Licensing Board (OCILB) licenses electrical, HVAC, refrigeration, plumbing and hydronics contractors who do commercial work.
Read more
A license must be assigned to a contracting company that carries at least $500,000 of liability insurance. Licensing and registration of residential contractors is left to cities, counties and other local governments. In a certified jurisdiction, the RCO lets the owner or the owner's authorized agent apply for plan approval (RCO 105.1). Whether a homeowner may do their own electrical or plumbing work is a local matter, so ask the building department.
Electrical, plumbing and HVAC
OCILB licenses electrical, plumbing, HVAC, refrigeration and hydronics contractors for commercial work only. Applicants need five years of experience in the trade and must pass a state exam.
Read more
Ohio has no state license for residential electricians, plumbers or HVAC contractors, and many cities and counties set their own registration rules. Electrical, plumbing and mechanical work on homes is permitted and inspected by the certified local building department under the RCO. In places with no certified residential department, there is no state residential trade inspection.
State programs that can affect your permit
Manufactured home installation inspections
Every manufactured home installed in Ohio must be inspected against the Ohio manufactured home installation standards by a state-certified or state-trained inspector (Ohio Adm. Code 4781-7-01). The inspection seal is paid for when the installation permit is issued. HUD-code manufactured homes are excepted from the RCO and are built and installed under their own approval (RCO 101.2).
Verified October 28, 2026 against Ohio sources. Ohio permit rules, sources and other counties
Common projects in Fulton County
Ohio has statewide rules on file for 4 of these projects; they apply in Fulton County along with local permit requirements.
Decks
A deck is exempt from RCO approval only if it is no more than 200 sq ft, no more than 30 inches above grade at any point, not attached to the house, and does not serve the required exit door (RCO 102.10). Attached decks need approval where a certified residential department has jurisdiction.
Fences
Fences not over 6 ft high are exempt from RCO approval. Retaining walls up to 4 ft, measured from the bottom of the footing, are also exempt unless they support a surcharge (RCO 102.10). Local zoning may still regulate fences.
Sheds and accessory buildings
One-story detached accessory structures used as tool or storage sheds, playhouses and similar uses are exempt from RCO approval if the floor area is no more than 200 sq ft (RCO 102.10). The structure must still meet the code.
Ohio source: law.cornell.edu ↗ · Sheds and accessory buildings permit guide
Electrical work
Residential electrical work follows RCO Chapter 34, which adopts the 2023 NEC with Ohio amendments. Small jobs are exempt from approval, such as replacing a breaker of the same size and type in the same place, minor repairs and low-voltage work under 25 volts and 50 watts (RCO 102.10).
Ohio source: dam.assets.ohio.gov ↗ · Electrical work permit guide
Guides for other projects: Roof replacement · Water heaters · Heating and air conditioning · Rooftop solar · Pools and spas · Accessory dwelling units · Demolition · Plumbing work · All 21 project guides
Other permits you may need in Fulton County
These are separate from the building permit and come from the agencies named, under Ohio rules.
Septic system
Local board of health (ODH rules)
Household sewage treatment systems are permitted by the local board of health under Ohio Department of Health rules in Ohio Administrative Code Chapter 3701-29. Before accepting a permit application the board requires a site review that includes a soil evaluation and a system design, and no new, replacement or altered system may be installed without a board of health installation or alteration permit, which is valid for one year. The board inspects the installation, and the system also needs a valid operation permit from the board of health.
Erosion and sediment control
Ohio EPA
Construction activities that disturb one acre or more, or less than one acre when part of a larger common plan of development or sale, need Ohio EPA NPDES storm water permit coverage, either an individual permit or coverage under a general permit (OAC 3745-39-04).
Water well
Local board of health (ODH rules)
A permit from the local board of health is required before anyone constructs, alters or seals a private water well, and the application names the registered private water systems contractor doing the work (OAC 3701-28-03).
Read more
Within 30 days of completion, a completion form and a copy of the well log filed with the Ohio Department of Natural Resources go to the board of health, which inspects the system and samples the water before approving it.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does Fulton County have a countywide building permit office?
No, none was identified. For an address in a city or town, call that municipality's building department or city hall. For unincorporated land, Ohio law decides whether a local permit is needed (see "Outside city limits" on this page), and state requirements such as electrical, plumbing, or septic rules can still apply.
Can I apply for a permit online in Fulton County?
Yes. The listing includes an online permit portal at fultoncountyoh_permit.portal.iworq.net. The agency also publishes a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Fulton County?
Fulton County Regional Planning Commission publishes its fee schedule online (fultoncountyoh.com). Look up your project type there, and ask the office at 419-337-9214 for an estimate if your project is not listed.
How do I look up past permits for an address in Fulton County?
Start with the iWorQ portal at fultoncountyoh_permit.portal.iworq.net and search by address, parcel or permit number. If an older permit is not there, ask the office at 419-337-9214 for the file or send a public records request.
Can I check a contractor's license for work in Fulton County?
Yes, at elicense.ohio.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Fulton County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Fulton County borders Henry County, Lucas County, Williams County, Hillsdale County (Michigan), Lenawee County (Michigan).
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Fulton County.
