County Permit SearchU.S. compliance directory
NebraskaMadison County

Administrative overview · FIPS 31119

Madison County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Madison County Joint Planning Department

For a project in or near Madison County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(402) 370-3577

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

1112 Bonita Drive, Norfolk, NE 68701

Operating hours

Tuesday–Friday 8:00 a.m.–4:30 p.m. at the Norfolk office; Monday at the Pierce County Courthouse

Review expectation

Allow at least two weeks for permit processing. The approved 2026 permit is valid for one year from the approval date.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Madison County

Who handles permitting for this jurisdiction?

Madison County Joint Planning Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact (402) 370-3577 and request the current application route before preparing a final submittal.

How long might review take?

Allow at least two weeks for permit processing. The approved 2026 permit is valid for one year from the approval date.

How are inspections scheduled?

All zoning permits are subject to inspection. The 2026 application instructs the applicant to contact the Madison/Pierce County Planning Department to schedule an inspection before the structure is used; call (402) 370-3577.

Which codes and exemptions should I review?

N/A; the 2026 zoning permit requires the owner/contractor to comply with all applicable building codes, but the county materials do not identify a technical code edition. A zoning/building permit is required for any structure larger than 100 square feet, including agricultural and portable structures; structures at or below 100 square feet are not covered by that stated threshold. Agricultural buildings/structures on agricultural operations of 20 acres or more and buildings, additions, or decks under 650 square feet pay only the $50 base fee rather than the higher square-footage fee.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?