County Permit SearchU.S. compliance directory
MississippiSimpson County

Administrative overview · FIPS 28127

Simpson County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Simpson County Community Development Department

For a project in or near Simpson County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

601-675-2366

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

111 West Pine Avenue, Suite 2, Mendenhall, MS 39114 (county administrative office address; Community Development office location is not separately published)

Operating hours

Monday-Friday, 8:00 AM-5:00 PM

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Simpson County

Who handles permitting for this jurisdiction?

Simpson County Community Development Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 601-675-2366.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

The application includes a site-inspection date field. For manufactured homes, the fire-marshall inspection and decal must be completed before final setup, and the county building inspector must complete required inspections before power is released. Contact Community Development at 601-675-2366 or communitydevelopment@co.simpson.ms.us during office hours; submit plan PDFs by email as directed by the requirements sheet.

Which codes and exemptions should I review?

The county's Building Permit Requirements state that all construction must comply with county and state laws regulating construction and the 2021 International Building Codes. Metal-building plans must be stamped by a Mississippi-licensed engineer and use a 115-mph wind speed. No general minor/cosmetic exemption list is published; the county requires permits for new commercial and residential buildings, remodeling projects, and manufactured homes. Form 335 soil/site evaluation is not required when sewer is provided by a municipality or approved community system, but the final Form 910 is required before permanent-power release.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?