County Permit SearchU.S. compliance directory
MississippiMadison County

Administrative overview · FIPS 28089

Madison County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Madison County Planning and Zoning Department

For a project in or near Madison County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(601) 855-5501 (Zoning Administrator); (601) 855-5634, (601) 855-5695, or (601) 855-5507 (permit questions)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

125 West North Street, Canton, MS 39046; mailing P.O. Box 608, Canton, MS 39046

Operating hours

Monday through Friday, 8:00 a.m. to 5:00 p.m.

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Madison County

Who handles permitting for this jurisdiction?

Madison County Planning and Zoning Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact (601) 855-5501 (Zoning Administrator); (601) 855-5634, (601) 855-5695, or (601) 855-5507 (permit questions) and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

The Planning and Zoning Department administers inspections. Contact the Zoning Administrator at (601) 855-5501. Electrical or gas service restoration requires inspection; electrical/gas permits are $85. Mobile-home projects require sewer, State Fire Marshal, and county inspections. E-911 address questions: (601) 859-4188.

Which codes and exemptions should I review?

N/A: the county administers building permits and inspections, but the official pages do not identify the adopted structural-code edition. For new construction, additions, major renovations, accessory structures, manufactured homes, and relocated structures, the county requires a permit and plans. No minor/cosmetic exemption list was identified. Mobile-home placement requires zoning verification, a minimum two-acre A-1 lot, address, health-department approvals, water verification, and inspections.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?