County Permit SearchU.S. compliance directory
KentuckyWebster County

Administrative overview · FIPS 21233

Webster County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Webster County Local Building Inspection Program and Kentucky Department of Housing, Buildings and Construction

For a project in or near Webster County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Local/State Building Inspector Travis Albin: 270-662-9038; State Electrical Inspector Pat O'Bryan: 270-899-1254; Webster County Health Department: 270-639-7799

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Webster County Health Department, 80 Clayton Avenue, Dixon, KY 42409 (listed office for plumbing and environmental services); building-inspection office address not published

Operating hours

Plumbing inspection office hours: Tuesday, 8:00-9:00 a.m. CST. General building-inspection office hours were not published.

Review expectation

N/A. No local or state permit-review timeline was published in the current Webster County contact sheet.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Webster County

Who handles permitting for this jurisdiction?

Webster County Local Building Inspection Program and Kentucky Department of Housing, Buildings and Construction is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Local/State Building Inspector Travis Albin: 270-662-9038; State Electrical Inspector Pat O'Bryan: 270-899-1254; Webster County Health Department: 270-639-7799 and request the current application route before preparing a final submittal.

How long might review take?

N/A. No local or state permit-review timeline was published in the current Webster County contact sheet.

How are inspections scheduled?

Contact Travis Albin at 270-662-9038 for building inspections. Electrical inspection jurisdiction is coordinated through the County Judge Executive or the city where work occurs; State Electrical Inspector Pat O'Bryan is 270-899-1254. State trade contacts include Manufactured Housing Inspector James Blackburn at 270-704-7171, HVAC Inspector Alan Bates at 270-619-1460, Plumbing Inspector Roy McGregor at 270-339-8539, Elevator Inspector Jacob Menser at 270-226-4742, and Boiler Inspector Billy Yarbrough at 502-682-2839.

Which codes and exemptions should I review?

Applicable Kentucky Building Code and Kentucky Residential Code requirements, including the National Electrical Code and state-referenced mechanical, plumbing, HVAC, manufactured-housing, elevator, and boiler standards. N/A. The current March 2026 DHBC county contact sheet identifies inspection contacts but does not publish a Webster County list of minor, cosmetic, or ordinary-repair exemptions. Confirm any exemption with Travis Albin or the appropriate state inspector.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?