County Permit SearchU.S. compliance directory
IowaBoone County

Administrative overview · FIPS 19015

Boone County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Boone County Planning & Development Department

For a project in or near Boone County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

515-433-0550

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Boone County Planning & Development, Boone County Courthouse, 201 State Street, Second Floor, Boone, IA 50036

Operating hours

Monday-Friday 8:00 a.m.-4:30 p.m., closed holidays

Review expectation

N/A; the county publishes application and meeting lead times for conditional-use and variance matters, but no general zoning/building permit review time was identified.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Boone County

Who handles permitting for this jurisdiction?

Boone County Planning & Development Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 515-433-0550.

How long might review take?

N/A; the county publishes application and meeting lead times for conditional-use and variance matters, but no general zoning/building permit review time was identified.

How are inspections scheduled?

Apply through the county's electronic permitting system and contact Planning & Development at 515-433-0550 for permit review and inspection requirements. A new rural E911 address requires a zoning permit first; driveway, floodplain, county-tile, well, and septic approvals may be separate.

Which codes and exemptions should I review?

Boone County Zoning Ordinance No. 88 as amended, including all-county zoning, district setbacks, land-use controls, subdivision and floodplain requirements, plus applicable Iowa state trade and electrical codes. The reviewed county materials do not identify a specific 2026 model technical building-code edition. The county requires building permits for all buildings in the county. Iowa Code Chapter 335's agricultural exemption applies to farm land, farm houses, farm barns, farm outbuildings, and other structures primarily adapted for agricultural use while so used; it exempts county zoning only. Floodplain, county-tile, well, septic, E911, driveway-access, and other permits may still be required. No broad cosmetic exemption list was published.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?