Washington County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Washington County Zoning Office

For a project in or near Washington County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(618) 327-4800 ext. 345

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Office of the Zoning Administrator, Old Sheriff’s Building, 125 W. St. Louis Street, Nashville, IL 62263

Operating hours

Monday-Friday 8:00 AM-4:00 PM

Review expectation

The ordinary permit form states that a compliant permit will be issued within a few days. For wind/solar special-use projects, applicants have one year after the special-use permit to apply for a building permit and two years thereafter to complete the project.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Washington County

Who handles permitting for this jurisdiction?

Washington County Zoning Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (618) 327-4800 ext. 345.

How long might review take?

The ordinary permit form states that a compliant permit will be issued within a few days. For wind/solar special-use projects, applicants have one year after the special-use permit to apply for a building permit and two years thereafter to complete the project.

How are inspections scheduled?

The certificate-of-zoning-compliance form includes inspection-date fields and requires a site plan and property measurements. Call (618) 327-4800 ext. 345 for an appointment; special solar/wind projects also require county review, road approvals, and inspections or third-party engineering as applicable.

Which codes and exemptions should I review?

The current county materials require compliance with the Washington County Zoning Ordinance and applicable local, Illinois, and national construction/electrical codes; no single 2026 edition list was published. The ordinance includes current commercial solar and wind siting requirements. The county states that all construction requires a building permit, including agricultural buildings. Its fee schedule lists agricultural-purpose buildings as ag-exempt from the filing fee and structures under 150 square feet at $0, but these fee exemptions do not state that construction is permit-free.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?