County Permit SearchU.S. compliance directory
AlaskaNorth Slope Borough

Administrative overview · FIPS 02185

North Slope Borough County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

North Slope Borough Department of Planning and Community Services, Land Management Regulation Division

For a project in or near North Slope Borough, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

907-852-0320 (Land Management Regulation); 907-852-2611 (Borough main)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

North Slope Borough, 1274 Agvik Street, Utqiagvik, AK 99723; mailing address P.O. Box 69, Utqiagvik, AK 99723.

Operating hours

N/A. Public office hours were not stated on the reviewed permit pages.

Review expectation

Published Form 700 instructions describe a typical 20-day public review and state that a permit is issued in approximately 40 days in most cases; current electronic submissions may vary with completeness and commission scheduling.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for North Slope Borough

Who handles permitting for this jurisdiction?

North Slope Borough Department of Planning and Community Services, Land Management Regulation Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 907-852-0320 (Land Management Regulation); 907-852-2611 (Borough main).

How long might review take?

Published Form 700 instructions describe a typical 20-day public review and state that a permit is issued in approximately 40 days in most cases; current electronic submissions may vary with completeness and commission scheduling.

How are inspections scheduled?

The North Slope AK portal allows applicants to apply, track permits, file code-enforcement complaints and schedule inspections. Applicants can also contact NSBPermitSubmittal@north-slope.org or 907-852-0320 for application and inspection guidance. The reviewed pages do not publish a stage-by-stage inspection checklist.

Which codes and exemptions should I review?

The Borough’s published permit program primarily enforces land-use, development, village-district, floodplain and cultural-resource requirements under North Slope Borough Code Title 19; it does not publish one general Borough structural-building-code edition in the reviewed materials. State Fire Marshal plan review, where applicable, uses Alaska’s 2021 International Building, Existing Building, Fire, Fuel Gas and Mechanical code cycle. Local cities, including Utqiagvik, may impose additional requirements. NSB Form 700 instructions state that repairs to an existing building/structure generally do not need a permit, including replacing a roof. Subsistence ice cellars, drying racks and hunting blinds are also listed as exempt. New homes, garages, storage structures, additions, moving structures, gravel fill for driveways/parking and foundation excavation require a Borough permit in the listed village districts; Utqiagvik uses a separate Form 800.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?