County Permit SearchU.S. compliance directory
NebraskaSaunders County

Administrative overview · FIPS 31155

Saunders County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Saunders County Planning and Zoning / Mitch Polacek, Zoning Administrator; Dustin Kaspar, Building Inspector

For a project in or near Saunders County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(402) 443-8136

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

433 N. Chestnut St, Suite 302, Wahoo, NE 68066

Operating hours

8:00 a.m.–12:00 p.m. and 12:30–4:30 p.m., Monday–Friday; closed weekends and holidays

Review expectation

N/A; the zoning regulations require the Zoning Administrator to issue or deny a written permit, but the reviewed page does not state a fixed timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Saunders County

Who handles permitting for this jurisdiction?

Saunders County Planning and Zoning / Mitch Polacek, Zoning Administrator; Dustin Kaspar, Building Inspector is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact (402) 443-8136 and request the current application route before preparing a final submittal.

How long might review take?

N/A; the zoning regulations require the Zoning Administrator to issue or deny a written permit, but the reviewed page does not state a fixed timeline.

How are inspections scheduled?

Submit the building-permit application with plans, plot plan, and required project information to Planning and Zoning; contact Building Inspector Dustin Kaspar or the office at (402) 443-8136 for inspection scheduling.

Which codes and exemptions should I review?

2018 International Building Code, 2018 International Energy Conservation Code, 2018 International Residential Code, and 2018 Uniform Plumbing Code; the county also publishes climatic and geographic design criteria. Farm outbuildings are exempt from the county utility-connection/building-permit prohibition. Non-farm buildings and structures generally require a building permit and zoning-compliance permit; confirm minor-maintenance exceptions with the county.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?