County Permit SearchU.S. compliance directory
NebraskaHoward County

Administrative overview · FIPS 31093

Howard County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Howard County Planning and Zoning Department

For a project in or near Howard County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(308) 754-9121; cell (308) 750-0615

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

612 Indian St. #2, St. Paul, NE 68873

Operating hours

9:00 a.m.–3:00 p.m., Tuesday and Thursday.

Review expectation

N/A; no general application-review timeline is published.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Howard County

Who handles permitting for this jurisdiction?

Howard County Planning and Zoning Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact (308) 754-9121; cell (308) 750-0615 and request the current application route before preparing a final submittal.

How long might review take?

N/A; no general application-review timeline is published.

How are inspections scheduled?

The permit application requires Howard Greeley RPPD setback approval at (308) 754-4457 and floodplain review when applicable. The Planning and Zoning Administrator conducts site visits as directed by county commissioners; no online inspection scheduler is published.

Which codes and exemptions should I review?

N/A; Howard County’s zoning materials address land use, setbacks, floodplain, utilities, and state approvals but do not identify a technical 2026 building-code edition. The official forms page provides an Improvement Information Sheet for work when a zoning permit is not required, but does not publish a consolidated list of minor or cosmetic exemptions. The zoning-permit fee is $25.00.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?