County Permit SearchU.S. compliance directory
MontanaValley County

Administrative overview · FIPS 30105

Valley County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

State Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked State Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Montana Department of Labor & Industry, Building Codes Bureau for building-code permits; Valley County Planning and Sanitation departments handle floodplain, septic, access-encroachment, planning, and addressing matters

For a project in or near Valley County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(406) 270-1884 (Valley County Planner); (406) 841-2056 (Montana Building Codes Bureau); (406) 439-2809 (Northeast Montana State Building Code Inspector listed by Valley County)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Valley County Planner, 501 Court Square, Number 18, Glasgow, MT 59230; Montana Building Codes Bureau, 301 South Park Avenue, Helena, MT 59620

Operating hours

N/A; Valley County’s official Planning page publishes the planner’s address and phone but not regular office hours. State Bureau hours were not published on the reviewed permit page.

Review expectation

The Montana Building Codes Bureau states that plan review averages three weeks. Valley County does not issue countywide building permits and does not publish a county review timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Valley County

Who handles permitting for this jurisdiction?

This record is marked State Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (406) 270-1884 (Valley County Planner); (406) 841-2056 (Montana Building Codes Bureau); (406) 439-2809 (Northeast Montana State Building Code Inspector listed by Valley County).

How long might review take?

The Montana Building Codes Bureau states that plan review averages three weeks. Valley County does not issue countywide building permits and does not publish a county review timeline.

How are inspections scheduled?

Apply through Montana’s Building Codes Bureau and call (406) 841-2056 for permit and inspection instructions; Valley County identifies the Northeast Montana State Building Code Inspector as Yancey Beston at (406) 439-2809. Contact Valley County Planning at (406) 270-1884 for planning, floodplain, access, and county coordination. Glasgow, Fort Peck, and Nashua applicants must also contact their local municipal offices for local zoning/building permits.

Which codes and exemptions should I review?

Montana’s current 2026 code set: 2021 International Building Code, 2021 International Residential Code, 2021 International Existing Building Code, 2021 International Mechanical Code, 2021 International Fuel Gas Code, 2021 International Energy Conservation Code, 2021 Uniform Plumbing Code, 2020 National Electrical Code, 2021 International Swimming Pool and Spa Code, and 2021 Wildland-Urban Interface Code, as amended by ARM Title 24, Chapter 301. Valley County does not issue countywide building permits. Valley County’s official building-permits notice lists state exemptions: farm and ranch buildings; residential buildings containing fewer than five dwelling units, private garages, and private storage buildings for the owner’s own use; mining buildings on mining property; and petroleum refineries and pulp/paper mills except office and shop buildings. County floodplain, septic, access-encroachment, well, and municipal permits may still be required.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?