County Permit SearchU.S. compliance directory
MontanaTeton County

Administrative overview · FIPS 30099

Teton County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

State Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked State Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Montana Department of Labor & Industry, Building Codes Bureau for building-code permits; Teton County Planning Department administers subdivision, floodplain, rural addressing, growth-policy, and land-use functions

For a project in or near Teton County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(406) 466-3130 (Teton County Planning office); (406) 750-6788 (County Planner); (406) 841-2056 (Montana Building Codes Bureau)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Teton County Planner, 19 Main Avenue South, PO Box 610, Choteau, MT 59422; Montana Building Codes Bureau, 301 South Park Avenue, Helena, MT 59620

Operating hours

N/A for Teton County Planning; the reviewed planner page publishes contact details but not regular office hours. State Bureau hours were not published on the reviewed permit page.

Review expectation

The Montana Building Codes Bureau states that plan review averages three weeks. Teton County’s planner page does not publish a general building-permit turnaround time.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Teton County

Who handles permitting for this jurisdiction?

This record is marked State Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (406) 466-3130 (Teton County Planning office); (406) 750-6788 (County Planner); (406) 841-2056 (Montana Building Codes Bureau).

How long might review take?

The Montana Building Codes Bureau states that plan review averages three weeks. Teton County’s planner page does not publish a general building-permit turnaround time.

How are inspections scheduled?

For covered building work, apply through Montana’s Building Codes Bureau and call (406) 841-2056 for permit and inspection instructions. Contact Teton County Planning at (406) 466-3130 or the County Planner at (406) 750-6788 for subdivision, floodplain, rural-address, and land-use coordination.

Which codes and exemptions should I review?

Montana’s current 2026 code set: 2021 International Building Code, 2021 International Residential Code, 2021 International Existing Building Code, 2021 International Mechanical Code, 2021 International Fuel Gas Code, 2021 International Energy Conservation Code, 2021 Uniform Plumbing Code, 2020 National Electrical Code, 2021 International Swimming Pool and Spa Code, and 2021 Wildland-Urban Interface Code, as amended by ARM Title 24, Chapter 301. Teton County is not listed as a certified county building-code program. State exemptions generally include farm or ranch buildings, mine buildings on mining property, petroleum refineries and pulp/paper mills except office/shop buildings, residential buildings with fewer than five dwelling units unless serving transient guests, and owner-used private garages/storage buildings. Teton County may still require subdivision, floodplain, rural-address, septic, or other planning approvals.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?