County Permit SearchU.S. compliance directory
MontanaBeaverhead County

Administrative overview · FIPS 30001

Beaverhead County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

State Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked State Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Montana Department of Labor & Industry, Building Codes Bureau; Beaverhead County Land Services handles county land-use and floodplain permits but the county’s growth policy states it has no countywide building-permit process

For a project in or near Beaverhead County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(406) 841-2056 (State Building Codes Bureau); (406) 683-3768 (Beaverhead County Land Services)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Montana Building Codes Bureau, 301 South Park Avenue, Helena, MT 59620; Beaverhead County Land Services, 2 South Pacific Street, Suite 7, Dillon, MT 59725

Operating hours

N/A for the state Building Codes Bureau; Beaverhead County Land Services: Monday-Friday 8:00 AM-5:00 PM

Review expectation

The Montana Building Codes Bureau states that plan review averages three weeks; issuance follows resolution of comments and payment of fees.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Beaverhead County

Who handles permitting for this jurisdiction?

This record is marked State Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (406) 841-2056 (State Building Codes Bureau); (406) 683-3768 (Beaverhead County Land Services).

How long might review take?

The Montana Building Codes Bureau states that plan review averages three weeks; issuance follows resolution of comments and payment of fees.

How are inspections scheduled?

For state-permitted work, contact the Montana Building Codes Bureau at (406) 841-2056 after permit issuance for inspection instructions. Contact Beaverhead County Land Services at (406) 683-3768 for county floodplain or special land-use permits; no countywide building inspection scheduler was published.

Which codes and exemptions should I review?

Montana’s current 2026 code set: 2021 International Building Code, 2021 International Residential Code, 2021 International Existing Building Code, 2021 International Mechanical Code, 2021 International Fuel Gas Code, 2021 International Energy Conservation Code, 2021 Uniform Plumbing Code, 2020 National Electrical Code, 2021 International Swimming Pool and Spa Code, and 2021 Wildland-Urban Interface Code, as amended by ARM Title 24, Chapter 301. At the state level, farm or ranch buildings, mine buildings on the mine site, petroleum refineries and pulp/paper mills except office/shop buildings, private homes or apartments with four or fewer dwelling units that do not serve transient guests, and private garages/storage buildings used only by the owner are generally exempt. Beaverhead County may still require subdivision, floodplain, Big Hole River conservation, wireless-facility, airport-area, or buildings-for-rent/lease permits.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?