County Permit SearchU.S. compliance directory
AlaskaMatanuska-Susitna Borough

Administrative overview · FIPS 02170

Matanuska-Susitna Borough County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Matanuska-Susitna Borough Development Services / Permit Center and Fire & Life Safety Division (Central Mat-Su Fire Service Area)

For a project in or near Matanuska-Susitna Borough, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

907-861-7822 (Permit Center); 907-861-8383 (Fire Code Office)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Matanuska-Susitna Borough Main Building, 350 E. Dahlia Avenue, Palmer, AK 99645; Central Mat-Su Fire Code Office, Station 51, 1911 S. Terrace Court, Palmer, AK 99645.

Operating hours

Monday-Friday, 8:00 AM-5:00 PM for the main Borough building; Fire Code office hours were not separately stated.

Review expectation

The Borough’s goal is to respond within three weeks when the submittal is complete; Fire & Life Safety plan review is usually completed within approximately three weeks, subject to corrections or additional information.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Matanuska-Susitna Borough

Who handles permitting for this jurisdiction?

Matanuska-Susitna Borough Development Services / Permit Center and Fire & Life Safety Division (Central Mat-Su Fire Service Area) is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 907-861-7822 (Permit Center); 907-861-8383 (Fire Code Office).

How long might review take?

The Borough’s goal is to respond within three weeks when the submittal is complete; Fire & Life Safety plan review is usually completed within approximately three weeks, subject to corrections or additional information.

How are inspections scheduled?

Submit through the MSB permit portal, pay the invoiced plan-review fee, and post the approval certificate as required. When work is complete and ready to open to the public, schedule the final inspection with the Fire Code Office at 907-861-8383 or FireCode@matsugov.us. Central Mat-Su conducts fire/life-safety inspections and commercial annual inspections in its service area; private residences are not subject to routine fire-department inspections.

Which codes and exemptions should I review?

Alaska Title 13, Chapters 50-55 and MSB materials identify the current 2021 code cycle: 2021 International Building Code, International Fire Code, International Mechanical Code and International Existing Building Code, with Alaska amendments. The State of Alaska and MSB have not adopted the International Residential Code. Fire/life-safety review is delegated to Central Mat-Su Fire Service Area within its service area; Palmer, Wasilla, Houston and other authorities may impose additional requirements. Residential housing that is a triplex or smaller is exempt from the state/MSB fire-and-life-safety plan-review requirement. Other Borough permits can still apply, including mandatory land-use permits for structures within 75 feet of a waterbody outside Palmer, Wasilla and Houston, floodplain permits, driveway/ROW permits, multifamily permits and conditional-use permits. A state or local exemption does not eliminate requirements of another authority.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?