County Permit SearchU.S. compliance directory
LouisianaOrleans Parish

Administrative overview · FIPS 22071

Orleans Parish County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

Municipal Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

City of New Orleans Department of Safety & Permits

For a project in or near Orleans Parish, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Department (504) 658-7200; Building Division (504) 658-7130

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

1340 Poydras Street, Suite 800, New Orleans, LA 70112

Operating hours

Monday-Friday, 9:00 AM-5:00 PM

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Orleans Parish

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Department (504) 658-7200; Building Division (504) 658-7130.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Inspections can be requested only after a permit is issued. Email inspections@nola.gov with contact name, phone, property address, permit number, and inspection type; monitor the One Stop App for status. Re-roofing is the exception to scheduled inspections and requires staged geotagged inspection photos.

Which codes and exemptions should I review?

The Department enforces the International Residential Code and International Building Code; official guidance specifically identifies IBC 2021 for qualifying change-of-use projects. The accessible current pages do not enumerate every applicable 2026 code edition. The official Section 105.2 guidance exempts certain limited exterior maintenance, including removal and replacement of less than 50% of deteriorated exterior wall weatherboards, aluminum, or vinyl siding, unless the Director determines hazardous or complex conditions require a permit. Sheathing replacement is not exempt. The general building-permit requirements still apply to new construction and most alterations or renovations.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?