County Permit SearchU.S. compliance directory
GeorgiaSeminole County

Administrative overview · FIPS 13253

Seminole County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Seminole County Zoning and Code Enforcement Department

For a project in or near Seminole County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

229-524-2878

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

230 Cherry Street, Donalsonville, GA 39845

Operating hours

Monday-Friday, 8:00 AM-5:00 PM

Review expectation

Inspection scheduling is workload-based; requests received after 4:00 PM are not placed on the next day’s schedule.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Seminole County

Who handles permitting for this jurisdiction?

Seminole County Zoning and Code Enforcement Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 229-524-2878 and request the current application route before preparing a final submittal.

How long might review take?

Inspection scheduling is workload-based; requests received after 4:00 PM are not placed on the next day’s schedule.

How are inspections scheduled?

Email Building Inspections or contact the Zoning and Code Enforcement Department at 229-524-2878. Requests must be received by 4:00 PM before the requested inspection date; scheduling depends on daily workload, no appointment time is given, and an inspection-ready failure costs $50 for reinspection.

Which codes and exemptions should I review?

The county page still displays an older code list, but Georgia’s mandatory 2026 state minimum set applies statewide: 2024 International Building, Residential, Fuel Gas, Mechanical, Plumbing, Fire, and Swimming Pool and Spa Codes with Georgia amendments, plus the 2023 National Electrical Code with 2026 Georgia amendments and the applicable Georgia energy-code amendments. N/A; no current county minor or cosmetic exemption list was published.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?