Who issues permits
Montgomery County Code Enforcement is the county office listed for building permits in Montgomery County.
How to get a permit in Montgomery County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Request the application from the office at 912-347-9828; no form or portal is published online.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Ask which inspections are required when the permit is issued, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Search Montgomery County permit records
No online permit portal is listed, so permit history is kept by Montgomery County Code Enforcement. Call 912-347-9828 or visit 310 W. Broad Street, Mount Vernon, GA 30445 with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Building codes and exemptions
Codes referenced
Countywide construction-code enforcement under Montgomery County ordinances and applicable Georgia State Minimum Standard Codes; the reviewed current sources do not publish a specific 2026 edition list.
Georgia: statewide code based on the 2024 IRC and 2024 IBC, effective January 1, 2026. Details
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Not published online
We did not find these in the office’s online materials. Ask the office at 912-347-9828 about:
- Fees: the current fee schedule and an estimate for your project.
- Exempt work: which minor work needs no permit. No current consolidated minor-work exemption list was published in reviewed county sources.
- Inspections: which inspections are required and how to request them.
- Review times: how long plan review currently takes.
- Work without a permit: the penalty for starting work before a permit is issued. The reviewed current county sources identify building-regulation enforcement but do not publish a specific current fine, doubled fee, or stop-work procedure.
Georgia rules that apply in Montgomery County
These rules come from Georgia law and state agencies, so they apply in Montgomery County on top of anything the local office requires.
Building code
Statewide code
Under the Uniform Codes Act, DCA adopts 'mandatory' state minimum codes that apply to all construction in Georgia whether or not they are enforced locally. The DCA Board adopted the 2024 editions with an effective date of January 1, 2026: the 2024 International Residential Code, Building Code, Plumbing Code, Mechanical Code, Fuel Gas Code and Swimming Pool and Spa Code, each with Georgia amendments, plus the 2024 International Fire Code as adopted by the Safety Fire Commissioner and the 2023 National Electrical Code with 2026 Georgia amendments.
Read more
The energy code is still the 2015 International Energy Conservation Code with Georgia supplements and amendments. The Georgia amendments to the residential code delete its Chapter 1 (administration), so permit rules such as which small projects are exempt are set by each local government. The International Existing Building Code, the International Property Maintenance Code and the National Green Building Standard are 'permissive' codes: they apply only where a city or county adopts them. A further package (amendments to the 2024 IBC, plus the 2024 IEBC and IPMC as permissive codes) goes to the DCA Board on November 19, 2026, and would take effect January 1, 2027 if adopted.
Georgia Department of Community Affairs, Office of Construction Codes and Industrialized Buildings ↗
Outside city limits
In unincorporated areas, the county is the permitting authority, but only if it runs a code enforcement program. Georgia law does not require a city or county to enforce the state codes. A local government that chooses to enforce them must adopt administrative procedures (permits, fees, inspections, appeals), and it can pick which mandatory codes it enforces.
Read more
It can also contract with another local government to do the enforcement. Where a county does not enforce a code, there may be no county permit or inspection for that work. The mandatory state codes still apply to the construction, though. Local governments may adopt stricter local amendments only after sending them to DCA for review.
Contractor and trade licensing
Residential and general contractors are licensed by the State Licensing Board for Residential and General Contractors under the Secretary of State (O.C.G.A. 43-41-1 through 43-41-17). The Attorney General's Consumer Protection Division notes that roofers, painters, drywall contractors and repair handymen are not licensed by the state.
Read more
Plumbers, electricians and air-conditioning contractors are licensed by a separate board, the Construction Industry Licensing Board. Most contractors also need a city or county business license. Homeowners can act as their own builder. Local permit offices accept a homeowner affidavit under O.C.G.A. 43-41-17(h). The owner swears that they live in or will live in the property, that it will not be offered for sale or lease and will not be used by the general public, and that they will personally supervise the work. Any work the owner subcontracts must go to Georgia-licensed contractors. How long the owner must stay in the home is set locally: East Point's form, for example, requires 24 months.
Electrical, plumbing and HVAC
Electricians, plumbers, conditioned-air (HVAC) contractors and other utility-related trades are licensed by the Georgia Construction Industry Licensing Board under the Secretary of State.
Read more
Trade permits and inspections are issued by the city or county building department, not by a state office. Many local departments let a homeowner pull electrical, plumbing or HVAC permits for their own single-family home by signing a homeowner affidavit, but the conditions vary from place to place.
State programs that can affect your permit
Industrialized (modular) buildings program
DCA approves factory-built 'industrialized' buildings, both homes and commercial buildings, that are built to the Georgia state codes and inspected during manufacture. An approved building carries a DCA insignia and is deemed to comply with local construction ordinances. Local governments still control the site work: zoning, grading, foundations and utility hook-ups. HUD-code manufactured (mobile) homes are not part of this program.
Manufactured housing installation permits
The Office of Insurance and Safety Fire Commissioner licenses manufactured-home manufacturers, retailers and installers. It also issues a permit for each manufactured-home installation and does random inspections of installers' work.
Septic (on-site sewage) permits
The Department of Public Health writes the statewide rules for on-site sewage management systems. The county board of health issues the installation permit, inspects the finished system and sets minimum lot sizes. DPH recommends at least half an acre with public water, or one acre with a private well, for a typical three- or four-bedroom home.
Verified October 28, 2026 against Georgia sources. Georgia permit rules, sources and other counties
Common projects in Montgomery County
No Georgia-specific rules for these projects are on file here, so ask the permit office what each needs in Montgomery County.
Permit guides by project: Decks · Fences · Sheds and accessory buildings · Roof replacement · Water heaters · Heating and air conditioning · Electrical work · Rooftop solar · All 21 project guides
Other permits you may need in Montgomery County
These are separate from the building permit and come from the agencies named, under Georgia rules.
Septic system
County boards of health (Georgia Department of Public Health)
The county health department must issue a construction permit before an on-site sewage system is installed or a lot is developed for one, under DPH Rules Chapter 511-3-1. Permits require a county site inspection and a soil evaluation by a DPH-certified soil classifier, and are valid up to 12 months. The system cannot be backfilled or used until the county does a final inspection and gives written approval.
Floodplain development
Georgia EPD Floodplain Management Unit
The Floodplain Management Unit in EPD's Watershed Protection Branch is Georgia's state floodplain office for the NFIP. It produces flood hazard maps for all 159 counties, publishes model flood damage prevention ordinances, and reviews local ordinances.
Read more
Cities and counties adopt and enforce those ordinances, so floodplain development permits come from the local floodplain administrator.
Official page: epd.georgia.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Erosion and sediment control
Georgia EPD and Local Issuing Authorities
Construction that disturbs 1 acre or more, or less if part of a larger common plan of 1 acre or more, needs coverage under EPD's NPDES construction stormwater general permits (GAR100001, GAR100002, GAR100003).
Read more
Land-disturbance permits under the Erosion and Sedimentation Act come from cities and counties certified as Local Issuing Authorities. State waters carry a 25-foot undisturbed buffer (50 feet on trout streams).
Water well
County health departments (Georgia DPH); drillers licensed through Georgia EPD
Wells must be installed by a licensed water well contractor, and the contractor must notify the county health department of the intent to drill before construction. Contractors are licensed under the Water Well Standards Act through EPD, acting for the Water Well Standards Advisory Council.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Montgomery County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 912-347-9828 if you are unsure.
Can I apply for a permit online in Montgomery County?
No online permit portal was found for this listing. Contact the office at 912-347-9828 to ask how applications are accepted.
How much does a building permit cost in Montgomery County?
Montgomery County Code Enforcement has no fee schedule online, so the cost has to come from the office. Call the office at 912-347-9828 with the project type, size and estimated value for a quote.
How do I look up past permits for an address in Montgomery County?
There is no online permit search for this listing. Ask the office at 912-347-9828 for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.
Can I check a contractor's license for work in Montgomery County?
Yes, at verify.sos.ga.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Montgomery County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Montgomery County borders Jeff Davis County, Toombs County, Treutlen County, Wheeler County.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Montgomery County.
