County Permit SearchU.S. compliance directory
GeorgiaBerrien County

Administrative overview · FIPS 13019

Berrien County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Berrien County Code Enforcement, Planning and Zoning

For a project in or near Berrien County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(229) 686-2149 Option 2; county administration (229) 686-5421

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

201 N Davis Street, Room 122, Nashville, GA 31639

Operating hours

Monday-Friday 8:00 AM-5:00 PM

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Berrien County

Who handles permitting for this jurisdiction?

Berrien County Code Enforcement, Planning and Zoning is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (229) 686-2149 Option 2; county administration (229) 686-5421.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Contact Building Inspector Greg Shoupe or the Code Enforcement office for building, electrical, mechanical, plumbing and mobile-home inspections; the reviewed county page does not publish an online inspection scheduler.

Which codes and exemptions should I review?

Georgia State Minimum Standard Codes in effect for 2026: 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, Fire, and Swimming Pool and Spa Codes with Georgia amendments, plus the 2023 National Electrical Code with 2026 Georgia amendments. N/A; the county page lists permitting for building, electrical, mechanical, plumbing, mobile-home installation and related work but does not publish a complete minor/cosmetic exemption list.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?