Digital permit application gateway

Apply for a permit in Paulding County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Portal link not verifiedAgency website ↗

Typical review lane

Building permits are issued through the office during 8:00 AM-5:00 PM; inspection requests are generally scheduled for the next business day when possible.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call 770-443-7571 (permits); 770-505-1398 (inspections) if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Paulding County

Who handles permitting for this jurisdiction?

Paulding County Community Development, Building & Permitting Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 770-443-7571 (permits); 770-505-1398 (inspections) and request the current application route before preparing a final submittal.

How long might review take?

Building permits are issued through the office during 8:00 AM-5:00 PM; inspection requests are generally scheduled for the next business day when possible.

How are inspections scheduled?

Call 770-505-1398 or email bldginspections@paulding.gov. Post the permit on the lot before requesting inspection; footing, framing/rough, and final inspections are required as applicable. Requests are scheduled for the next business day when possible, and re-inspection fees are $50, $100, and $200 for the first, second, and third-or-more reinspection.

Which codes and exemptions should I review?

Paulding County enforces the current Georgia State Minimum Standard Codes and adopted county building, electrical, HVAC, plumbing, and related development requirements; the reviewed county page does not enumerate a separate 2026 edition list. A fence no more than six feet tall does not require a permit under the county FAQ. The county's forms identify permits for accessory buildings, garages, additions, remodeling, storage buildings, swimming pools, and fences over seven feet; other minor-work exemptions should be confirmed with the division.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.