Digital permit application gateway

Apply for a permit in Laramie County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the SmartGov public portal.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

Most complete permit submittals are issued within seven to ten business days; commercial review time depends on project size and complexity. Incomplete applications are not accepted.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

No verified form linkReview current fees ↗

Before submission, call 307-633-4303; inspection requests 307-633-4615; violations 307-775-7456 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Laramie County

Who handles permitting for this jurisdiction?

Laramie County Planning & Development - Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 307-633-4303; inspection requests 307-633-4615; violations 307-775-7456.

How long might review take?

Most complete permit submittals are issued within seven to ten business days; commercial review time depends on project size and complexity. Incomplete applications are not accepted.

How are inspections scheduled?

Request inspections through the SmartGov portal after registering and obtaining an access code from 307-633-4303, or call the inspection line at 307-633-4615. Requests may be made at any time, but applicants should allow at least two business days for scheduling. Approved plans must be on site, and each required inspection must pass before work advances to the next phase.

Which codes and exemptions should I review?

2024 International Building Code, 2024 International Residential Code, 2024 International Fire Code, 2024 International Plumbing Code, 2024 International Fuel Gas Code, 2024 International Existing Building Code and 2024 International Mechanical Code, all with County amendments; 2023 National Electrical Code. The 2024 IBC/IRC family became effective January 1, 2025, and the 2024 IFC became effective April 15, 2025. County residential permit exemptions include nonstructural reroofing, siding, replacement of windows with same-size windows, and detached residential accessory structures without habitable space not exceeding 400 square feet; certain agricultural-building exceptions may also apply and must be confirmed with the office. Most other work requires permits and inspections, including basement finishing, manufactured-home placement, solar, generators and personal wind turbines.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.