Digital permit application gateway

Apply for a permit in St. Croix County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

For a complete application and supporting documents, the Zoning Administrator will prepare approval or denial findings within 60 days.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call 715-386-4680 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for St. Croix County

Who handles permitting for this jurisdiction?

St. Croix County Community Development Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 715-386-4680.

How long might review take?

For a complete application and supporting documents, the Zoning Administrator will prepare approval or denial findings within 60 days.

How are inspections scheduled?

Book county sanitary inspections and office appointments through the online appointment portal or call 715-386-4680. For a land-use application, county staff conduct a site visit and the applicant must flag and label applicable property/project corners. Schedule UDC, building and trade inspections separately with the inspector serving the applicable town or municipality.

Which codes and exemptions should I review?

St. Croix County administers Chapter 15 general zoning in all unincorporated towns except Forest, Hudson, St. Joseph and Troy, plus countywide-township shoreland, floodplain, land-division, Lower St. Croix Riverway and sanitary/POWTS regulations. Cities, villages and the four excluded towns enforce their own general zoning. Building permits, Wisconsin UDC and construction/trade inspections are handled by the applicable town or municipality. Uses classified as Permitted by Right in §15.285 do not need a county land-use permit unless an overlay or another ordinance requires approval; changing only the message on an existing sign is expressly permit-exempt. Applicants should confirm project-specific exemptions because shoreland, riverway and floodplain overlays can independently require county review.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.