County Permit SearchU.S. compliance directory
← Campbell County overview

Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Campbell County.

All Campbell County permits issued after January 18, 2025 are subject to the 2021 Virginia Uniform Statewide Building Code cycle. This includes the 2021 Virginia Construction, Residential, Existing Building, Plumbing, Mechanical, Fuel Gas, Energy Conservation, and Swimming Pool and Spa codes, the referenced 2020 National Electrical Code, and applicable Virginia Statewide Fire Prevention, Industrialized Building Safety, Manufactured Home Safety, and Amusement Device regulations. County design criteria include 25 psf ground snow load, 110 mph wind speed, seismic category B, 18-inch frost depth, severe weathering, and moderate-to-heavy termite exposure.

Inspection lane

Request inspections through the Campbell County SmartGov portal at https://co-campbell-va.smartgovcommunity.com/Public/Home or call 434-332-9596 with the permit number. The portal also displays pending applications, issued permits, and inspection results. Required work must remain exposed and accessible until approved; a $50 reinspection fee applies when the address is wrong or absent, the premises are inaccessible, corrections were not made, or work is not ready.

Minor-work playbook

Understand what may be exempt—and what is not.

Campbell County lists painting; residential reroofing; replacement windows and doors outside fire-rated assemblies; repair or replacement of interior walls and wall coverings; floor and porch-floor coverings; cabinets; repair or replacement of existing plumbing and electrical fixtures; common-appliance replacement; residential siding; lighting systems under 50 volts; and fences as examples that may be exempt. Qualifying one-story detached storage buildings and garages of 256 square feet or less may also be exempt under the Virginia USBC. Zoning, floodplain, land-disturbance, health, or other approval can still apply.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Request inspections through the Campbell County SmartGov portal at https://co-campbell-va.smartgovcommunity.com/Public/Home or call 434-332-9596 with the permit number. The portal also displays pending applications, issued permits, and inspection results. Required work must remain exposed and accessible until approved; a $50 reinspection fee applies when the address is wrong or absent, the premises are inaccessible, corrections were not made, or work is not ready.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Campbell County

Who handles permitting for this jurisdiction?

Campbell County Community Development, Building Inspections Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 434-332-9596.

How long might review take?

Most complete permits can be issued while the applicant waits; permits requiring plan review may take several days. The online portal asks applicants to allow 24 business hours for an email response regarding application status.

How are inspections scheduled?

Request inspections through the Campbell County SmartGov portal at https://co-campbell-va.smartgovcommunity.com/Public/Home or call 434-332-9596 with the permit number. The portal also displays pending applications, issued permits, and inspection results. Required work must remain exposed and accessible until approved; a $50 reinspection fee applies when the address is wrong or absent, the premises are inaccessible, corrections were not made, or work is not ready.

Which codes and exemptions should I review?

All Campbell County permits issued after January 18, 2025 are subject to the 2021 Virginia Uniform Statewide Building Code cycle. This includes the 2021 Virginia Construction, Residential, Existing Building, Plumbing, Mechanical, Fuel Gas, Energy Conservation, and Swimming Pool and Spa codes, the referenced 2020 National Electrical Code, and applicable Virginia Statewide Fire Prevention, Industrialized Building Safety, Manufactured Home Safety, and Amusement Device regulations. County design criteria include 25 psf ground snow load, 110 mph wind speed, seismic category B, 18-inch frost depth, severe weathering, and moderate-to-heavy termite exposure. Campbell County lists painting; residential reroofing; replacement windows and doors outside fire-rated assemblies; repair or replacement of interior walls and wall coverings; floor and porch-floor coverings; cabinets; repair or replacement of existing plumbing and electrical fixtures; common-appliance replacement; residential siding; lighting systems under 50 volts; and fences as examples that may be exempt. Qualifying one-story detached storage buildings and garages of 256 square feet or less may also be exempt under the Virginia USBC. Zoning, floodplain, land-disturbance, health, or other approval can still apply.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.