Digital permit application gateway

Apply for a permit in Garfield County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

N/A for plan review; the county publishes no standard approval duration. Inspection requests require at least two working days' notice. No building-permit fees are refunded after 180 days, and if no mandatory inspection has occurred within one year, the permit holder must renew the permit under the fee schedule.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

No verified form linkReview current fees ↗

Before submission, call Building Official: 435-676-1111; Building Department secretary: 435-676-1165; fax: 435-676-8239; county main line: 435-676-1100; alternate third-party inspector (Iron County): 435-865-5350 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Garfield County

Who handles permitting for this jurisdiction?

Garfield County Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Building Official: 435-676-1111; Building Department secretary: 435-676-1165; fax: 435-676-8239; county main line: 435-676-1100; alternate third-party inspector (Iron County): 435-865-5350.

How long might review take?

N/A for plan review; the county publishes no standard approval duration. Inspection requests require at least two working days' notice. No building-permit fees are refunded after 180 days, and if no mandatory inspection has occurred within one year, the permit holder must renew the permit under the fee schedule.

How are inspections scheduled?

Schedule through the City Inspect portal or contact the Garfield County Building Department by phone or in writing no fewer than two working days before the proposed inspection. Work must remain accessible and exposed until approved. Published stages are footing, foundation walls, four-way rough framing/electrical/plumbing/mechanical and energy-code items, insulation and shower pan, gypsum board before finishing, final before occupancy, and any additional compliance inspection the department requires. The county will not perform a final inspection on an occupied building or issue a final approval or certificate of occupancy while code violations remain uncorrected. Reinspection fees must be paid before the next request. Iron County is listed as the SB 185 alternate third-party inspector at 435-865-5350.

Which codes and exemptions should I review?

Garfield County directs applicants to the Utah State Construction Code and applicable statewide amendments. Effective July 1, 2026, that code comprises the 2024 International Building Code, 2021 International Residential Code and Appendix AQ, 2024 International Plumbing Code, 2024 International Mechanical Code, 2024 International Fuel Gas Code, 2023 National Electrical Code, 2024 International Energy Conservation Code, 2024 International Existing Building Code, residential provisions of the 2024 International Swimming Pool and Spa Code, and applicable Utah amendments; the 2024 International Fire Code is the current State Fire Code. Projects use the codes in effect when a complete plan submission is accepted for review. The county issues residential and commercial permits and performs building, plumbing, electrical, and mechanical inspections; applicants within incorporated city limits must first provide city approval. The county's published shed policy exempts a one-story detached tool/storage shed, playhouse, or similar accessory structure under 200 square feet only when it has no power, water, or heat. A shed of 200 square feet or more, or any shed with power, water, or heat, requires a permit. The exemption does not authorize code- or ordinance-violating work, and the county will not permit utilities to be extended to an existing shed that was constructed without a permit. The county does not publish a complete local cosmetic-work exemption list on its current Building Department page, so other exemptions are N/A and should be confirmed with the Building Official.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.