Digital permit application gateway

Apply for a permit in Titus County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Portal link not verifiedAgency website ↗

Typical review lane

Titus County's subdivision rules require the OSSF permitting authority to approve or deny subdivision or development OSSF planning materials in writing within 45 days of receipt. The checklist says complete subdivision documentation should be submitted at least 45 days before requested Commissioners Court consideration. No separate ordinary OSSF or floodplain review target is published.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call Environmental Inspection Service (OSSF and floodplain): 903-572-6641; County Clerk platting: 903-577-6796 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Titus County

Who handles permitting for this jurisdiction?

Titus County Environmental Inspection Service and Titus County Clerk Platting and Subdivision Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Environmental Inspection Service (OSSF and floodplain): 903-572-6641; County Clerk platting: 903-577-6796 and request the current application route before preparing a final submittal.

How long might review take?

Titus County's subdivision rules require the OSSF permitting authority to approve or deny subdivision or development OSSF planning materials in writing within 45 days of receipt. The checklist says complete subdivision documentation should be submitted at least 45 days before requested Commissioners Court consideration. No separate ordinary OSSF or floodplain review target is published.

How are inspections scheduled?

Obtain the OSSF permitting packet from the Environmental Inspection Service, submit the application, site evaluation and required design/planning materials, and call 903-572-6641 to coordinate authorization to construct and the installation inspection before covering or operating the system. The same office approves subdivision OSSF and floodplain information before a plat goes to Commissioners Court. Subdivision applicants must separately coordinate with the County Clerk at 903-577-6796.

Which codes and exemptions should I review?

Titus County Environmental Inspection Service is the county's TCEQ-authorized OSSF permitting authority and designated representative and also reviews floodplain requirements for unincorporated development. OSSF work must comply with the county's TCEQ-approved local order, Texas Health and Safety Code Chapter 366, and 30 TAC Chapter 285. County subdivision rules require one acre of usable property for new single-family OSSF lots, whether or not served by public water, and regulate rural subdivision roads and drainage. The county publishes no adopted general countywide IRC, IBC, electrical, plumbing, mechanical, or fire-code edition; incorporated municipalities may impose separate building requirements. Titus County states that work on any portion of an existing conventional system's lateral lines requires a new permit. Repairs to solid lines, tank lids, broken chlorinators, sprinkler heads, electrical components, and pumps do not require a new permit. An owner may install the OSSF personally, but anyone hired for OSSF work must hold the appropriate license, except a licensed electrician hired for wiring. Existing small lots created before January 1, 1988 may be approved if state separation distances, site evaluation, and all other local-order requirements are met. No county exemption list is published for ordinary cosmetic or structural building work outside floodplain, subdivision, or septic regulation.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.