County Permit SearchU.S. compliance directory
← Terry County overview

Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Terry County.

Terry County participates in the National Flood Insurance Program and regulates development in unincorporated flood-hazard areas through its county floodplain administration; the current state directory lists Chris Snapp as the county contact, while a December 2025 FEMA submission was signed by County Judge Tony Serbantez as local floodplain administrator. The county publishes no general building department and no adopted countywide IRC, IBC, electrical, plumbing, mechanical, or fire-code edition. Terry does not appear in TCEQ's current report of locally authorized OSSF programs, so septic permitting falls to TCEQ Region 2 under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285 unless the state confirms a newer local delegation. Incorporated municipalities and their ETJs may impose separate requirements.

Inspection lane

Contact the Terry County Judge's Office at 806-637-6421 or the listed county floodplain contact at 806-637-4547 before development in a mapped floodplain; no county online application or inspection scheduler is published. For a state-administered OSSF, submit the TCEQ application, site evaluation, planning materials, and fee to Region 2, then call 806-796-7092 to coordinate the required construction inspection before the system is covered or operated.

Minor-work playbook

Understand what may be exempt—and what is not.

Terry County publishes no general permit or exemption list for ordinary cosmetic or structural work outside regulated floodplains. State OSSF exceptions may include a qualifying system serving one single-family dwelling on a tract of at least 10 acres after a licensed site evaluation, with every system component at least 100 feet from the property line and all other rule conditions met; qualifying grandfathered systems and specified emergency repairs reported in writing within 72 hours may also be exempt.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Contact the Terry County Judge's Office at 806-637-6421 or the listed county floodplain contact at 806-637-4547 before development in a mapped floodplain; no county online application or inspection scheduler is published. For a state-administered OSSF, submit the TCEQ application, site evaluation, planning materials, and fee to Region 2, then call 806-796-7092 to coordinate the required construction inspection before the system is covered or operated.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Terry County

Who handles permitting for this jurisdiction?

Terry County Judge's Office (Floodplain Administration); Texas Commission on Environmental Quality Region 2 OSSF Program is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Terry County Judge's Office: 806-637-6421; county floodplain contact: 806-637-4547; TCEQ Region 2 Lubbock: 806-796-7092 and request the current application route before preparing a final submittal.

How long might review take?

No county floodplain review time is published. TCEQ must approve or deny a complete state-administered OSSF application and planning materials within 30 days.

How are inspections scheduled?

Contact the Terry County Judge's Office at 806-637-6421 or the listed county floodplain contact at 806-637-4547 before development in a mapped floodplain; no county online application or inspection scheduler is published. For a state-administered OSSF, submit the TCEQ application, site evaluation, planning materials, and fee to Region 2, then call 806-796-7092 to coordinate the required construction inspection before the system is covered or operated.

Which codes and exemptions should I review?

Terry County participates in the National Flood Insurance Program and regulates development in unincorporated flood-hazard areas through its county floodplain administration; the current state directory lists Chris Snapp as the county contact, while a December 2025 FEMA submission was signed by County Judge Tony Serbantez as local floodplain administrator. The county publishes no general building department and no adopted countywide IRC, IBC, electrical, plumbing, mechanical, or fire-code edition. Terry does not appear in TCEQ's current report of locally authorized OSSF programs, so septic permitting falls to TCEQ Region 2 under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285 unless the state confirms a newer local delegation. Incorporated municipalities and their ETJs may impose separate requirements. Terry County publishes no general permit or exemption list for ordinary cosmetic or structural work outside regulated floodplains. State OSSF exceptions may include a qualifying system serving one single-family dwelling on a tract of at least 10 acres after a licensed site evaluation, with every system component at least 100 feet from the property line and all other rule conditions met; qualifying grandfathered systems and specified emergency repairs reported in writing within 72 hours may also be exempt.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.