County Permit SearchU.S. compliance directory
← Kerr County overview

Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Kerr County.

Kerr County Engineering administers Flood Damage Prevention Order Nos. 37967 and 38000, as amended, for floodplain development and also regulates county-road driveways, utilities in county rights-of-way, subdivision construction, and manufactured-home rental communities outside Kerrville and Ingram. A floodplain determination or permit is required for any work in the floodplain. Environmental Health is the county's TCEQ-authorized OSSF authority under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. No general county structural building-permit program or adopted residential/commercial ICC code edition was found for ordinary construction outside a regulated floodplain; municipalities retain their own jurisdiction.

Inspection lane

Make an appointment with Engineering at 830-896-9046 for floodplain procedures and bring the appraisal-district property ID. Submit the completed floodplain application to floodplain@kerrcountytx.gov or in person at 3766 TX-27. No work may start until the development permit is issued; the administrator may inspect, an elevation certificate may be required within 10 business days after foundation completion, and occupancy must await a Certificate of Compliance. For OSSF plan review and inspections, contact Environmental Health at 830-896-9020; installation must remain uncovered until county inspection and approval to operate. No public online scheduling portal was found.

Minor-work playbook

Understand what may be exempt—and what is not.

The county's 2026 floodplain form provides a Development Permit Exemption Certificate when proposed development is outside the FEMA-identified 100-year floodplain, but that certificate does not waive deed restrictions, subdivision rules, OSSF rules, or other approvals. Under the presently published OSSF rules, the state exception may apply to a single-family dwelling on at least 10 acres only when all sewage stays on the tract and the system creates neither a nuisance nor groundwater pollution. Kerr County was considering a 2026 order requiring permits for every new or upgraded system regardless of tract size; existing qualifying systems are not retroactively affected. Confirm the adopted rule with Environmental Health before relying on an exception. No general cosmetic-building-work exemption list is published.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Make an appointment with Engineering at 830-896-9046 for floodplain procedures and bring the appraisal-district property ID. Submit the completed floodplain application to floodplain@kerrcountytx.gov or in person at 3766 TX-27. No work may start until the development permit is issued; the administrator may inspect, an elevation certificate may be required within 10 business days after foundation completion, and occupancy must await a Certificate of Compliance. For OSSF plan review and inspections, contact Environmental Health at 830-896-9020; installation must remain uncovered until county inspection and approval to operate. No public online scheduling portal was found.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Kerr County

Who handles permitting for this jurisdiction?

Kerr County Engineering Department and Environmental Health Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Engineering/Floodplain: 830-896-9046; Environmental Health/OSSF: 830-896-9020 and request the current application route before preparing a final submittal.

How long might review take?

Kerr County publishes no typical floodplain or OSSF review time. Its OSSF fee schedule offers a $200 expedite fee when fewer than five working days remain before the requested due date, but this is not a guaranteed standard turnaround. State rules require action on a complete OSSF application within 30 days.

How are inspections scheduled?

Make an appointment with Engineering at 830-896-9046 for floodplain procedures and bring the appraisal-district property ID. Submit the completed floodplain application to floodplain@kerrcountytx.gov or in person at 3766 TX-27. No work may start until the development permit is issued; the administrator may inspect, an elevation certificate may be required within 10 business days after foundation completion, and occupancy must await a Certificate of Compliance. For OSSF plan review and inspections, contact Environmental Health at 830-896-9020; installation must remain uncovered until county inspection and approval to operate. No public online scheduling portal was found.

Which codes and exemptions should I review?

Kerr County Engineering administers Flood Damage Prevention Order Nos. 37967 and 38000, as amended, for floodplain development and also regulates county-road driveways, utilities in county rights-of-way, subdivision construction, and manufactured-home rental communities outside Kerrville and Ingram. A floodplain determination or permit is required for any work in the floodplain. Environmental Health is the county's TCEQ-authorized OSSF authority under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. No general county structural building-permit program or adopted residential/commercial ICC code edition was found for ordinary construction outside a regulated floodplain; municipalities retain their own jurisdiction. The county's 2026 floodplain form provides a Development Permit Exemption Certificate when proposed development is outside the FEMA-identified 100-year floodplain, but that certificate does not waive deed restrictions, subdivision rules, OSSF rules, or other approvals. Under the presently published OSSF rules, the state exception may apply to a single-family dwelling on at least 10 acres only when all sewage stays on the tract and the system creates neither a nuisance nor groundwater pollution. Kerr County was considering a 2026 order requiring permits for every new or upgraded system regardless of tract size; existing qualifying systems are not retroactively affected. Confirm the adopted rule with Environmental Health before relying on an exception. No general cosmetic-building-work exemption list is published.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.