Digital permit application gateway

Apply for a permit in Kerr County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Portal link not verifiedAgency website ↗

Typical review lane

Kerr County publishes no typical floodplain or OSSF review time. Its OSSF fee schedule offers a $200 expedite fee when fewer than five working days remain before the requested due date, but this is not a guaranteed standard turnaround. State rules require action on a complete OSSF application within 30 days.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call Engineering/Floodplain: 830-896-9046; Environmental Health/OSSF: 830-896-9020 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Kerr County

Who handles permitting for this jurisdiction?

Kerr County Engineering Department and Environmental Health Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Engineering/Floodplain: 830-896-9046; Environmental Health/OSSF: 830-896-9020 and request the current application route before preparing a final submittal.

How long might review take?

Kerr County publishes no typical floodplain or OSSF review time. Its OSSF fee schedule offers a $200 expedite fee when fewer than five working days remain before the requested due date, but this is not a guaranteed standard turnaround. State rules require action on a complete OSSF application within 30 days.

How are inspections scheduled?

Make an appointment with Engineering at 830-896-9046 for floodplain procedures and bring the appraisal-district property ID. Submit the completed floodplain application to floodplain@kerrcountytx.gov or in person at 3766 TX-27. No work may start until the development permit is issued; the administrator may inspect, an elevation certificate may be required within 10 business days after foundation completion, and occupancy must await a Certificate of Compliance. For OSSF plan review and inspections, contact Environmental Health at 830-896-9020; installation must remain uncovered until county inspection and approval to operate. No public online scheduling portal was found.

Which codes and exemptions should I review?

Kerr County Engineering administers Flood Damage Prevention Order Nos. 37967 and 38000, as amended, for floodplain development and also regulates county-road driveways, utilities in county rights-of-way, subdivision construction, and manufactured-home rental communities outside Kerrville and Ingram. A floodplain determination or permit is required for any work in the floodplain. Environmental Health is the county's TCEQ-authorized OSSF authority under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. No general county structural building-permit program or adopted residential/commercial ICC code edition was found for ordinary construction outside a regulated floodplain; municipalities retain their own jurisdiction. The county's 2026 floodplain form provides a Development Permit Exemption Certificate when proposed development is outside the FEMA-identified 100-year floodplain, but that certificate does not waive deed restrictions, subdivision rules, OSSF rules, or other approvals. Under the presently published OSSF rules, the state exception may apply to a single-family dwelling on at least 10 acres only when all sewage stays on the tract and the system creates neither a nuisance nor groundwater pollution. Kerr County was considering a 2026 order requiring permits for every new or upgraded system regardless of tract size; existing qualifying systems are not retroactively affected. Confirm the adopted rule with Environmental Health before relying on an exception. No general cosmetic-building-work exemption list is published.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.