Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Harrison County.

Harrison County publishes a Flood Damage Prevention Order and requires floodplain development permits for construction, substantial improvements, fill, manufactured homes, tanks/equipment, and related development in mapped flood-hazard areas. The county does not publish a general countywide ICC building-code edition for ordinary construction outside those areas. Harrison County Environmental Health administers on-site sewage facilities under TCEQ requirements and 30 TAC Chapter 285. Incorporated municipalities may enforce separate building codes.

Inspection lane

For a floodplain permit, submit the signed application, scaled site and structure drawings, elevation information/certificate, ownership proof, directions, and the $20 fee to Road & Bridge. Contact the office at least two working days before construction for the required initial site inspection, and again after completion for the final inspection and Certificate of Compliance; submit revised as-built plans if the approved design changes. For OSSF work, obtain Authorization to Construct before installation and contact Environmental Health at least two working days before the system will be ready for inspection; the system may not be covered before inspection.

Minor-work playbook

Understand what may be exempt—and what is not.

No general county list of cosmetic or minor-work building exemptions was published. The floodplain permit applies when development is in a flood-hazard area, rather than to ordinary work countywide. Harrison County describes a limited 10-acre OSSF rule for a qualifying owner-occupied single-family property that is not being developed for sale or lease and meets all TCEQ and permitting-authority requirements; it does not apply when more than one home is installed, or to commercial or multifamily property. Any outside assistance with OSSF installation must be provided by an appropriately licensed installer.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    For a floodplain permit, submit the signed application, scaled site and structure drawings, elevation information/certificate, ownership proof, directions, and the $20 fee to Road & Bridge. Contact the office at least two working days before construction for the required initial site inspection, and again after completion for the final inspection and Certificate of Compliance; submit revised as-built plans if the approved design changes. For OSSF work, obtain Authorization to Construct before installation and contact Environmental Health at least two working days before the system will be ready for inspection; the system may not be covered before inspection.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

Verify contractor ↗

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Harrison County

Who handles permitting for this jurisdiction?

Harrison County Road & Bridge / Harrison County Environmental Health is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Road & Bridge/Floodplain: 903-935-4868; Environmental Health/OSSF: 903-935-4870 ext. 1362 and request the current application route before preparing a final submittal.

How long might review take?

Floodplain permit approval is approximately 5 working days after successful initial inspection and approval of all documentation. Environmental Health states that an OSSF Notice of Approval is issued approximately 5 working days after a successful final inspection; no standard pre-construction plan-review time is published.

How are inspections scheduled?

For a floodplain permit, submit the signed application, scaled site and structure drawings, elevation information/certificate, ownership proof, directions, and the $20 fee to Road & Bridge. Contact the office at least two working days before construction for the required initial site inspection, and again after completion for the final inspection and Certificate of Compliance; submit revised as-built plans if the approved design changes. For OSSF work, obtain Authorization to Construct before installation and contact Environmental Health at least two working days before the system will be ready for inspection; the system may not be covered before inspection.

Which codes and exemptions should I review?

Harrison County publishes a Flood Damage Prevention Order and requires floodplain development permits for construction, substantial improvements, fill, manufactured homes, tanks/equipment, and related development in mapped flood-hazard areas. The county does not publish a general countywide ICC building-code edition for ordinary construction outside those areas. Harrison County Environmental Health administers on-site sewage facilities under TCEQ requirements and 30 TAC Chapter 285. Incorporated municipalities may enforce separate building codes. No general county list of cosmetic or minor-work building exemptions was published. The floodplain permit applies when development is in a flood-hazard area, rather than to ordinary work countywide. Harrison County describes a limited 10-acre OSSF rule for a qualifying owner-occupied single-family property that is not being developed for sale or lease and meets all TCEQ and permitting-authority requirements; it does not apply when more than one home is installed, or to commercial or multifamily property. Any outside assistance with OSSF installation must be provided by an appropriately licensed installer.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.