Regulatory framework
The code baseline for Burleson County.
Burleson County states that it has no authority to create or enforce building codes or require building inspections in unincorporated areas; city limits are handled by the applicable city. The county does enforce subdivision regulations, county right-of-way permits, a 2008 Flood Damage Prevention Order/NFIP requirements for floodplain development, and a TCEQ-approved 2023 OSSF Order with more stringent county standards.
Inspection lane
Submit the OSSF application, technical sheet, site/soil evaluation, system design, required affidavits or maintenance contract, 911 address verification, and fee to the Environmental Office; email submissions are not accepted. The Designated Representative reviews within 30 days and issues an Authorization to Construct. The licensed installer requests the construction inspection; after a successful inspection the county issues a License to Operate, which is required before use. Floodplain applications, plans, and specifications are submitted to the Floodplain Office before construction.