Fees, valuation & enforcement

Know the cost of authorization—and the cost of skipping it.

Permit fees are a project input. Enforcement exposure is a project risk. Use the official schedule where available, then confirm valuation, trade permits, plan review, and inspection charges with the Authority Having Jurisdiction.

Official fee pathway

Build the permit budget from the issuing agency’s schedule.

The final charge may depend on declared construction value, occupancy classification, square footage, plan review, state surcharges, trade permits, technology fees, and inspection activity. Do not use a neighboring city’s fee table as a substitute for this jurisdiction.

Fee desk contact

517-241-9313 (LARA BCC permits); local municipal building departments use their own numbers

Ask the counter to confirm current charges before submitting a project with multiple trades or a change of use.

Financial exposure

Budget for the complete approval path.

Plan for building, mechanical, plumbing, electrical, fire, energy, zoning, septic, right-of-way, or other reviews that the project scope triggers. The lowest initial permit fee is not always the lowest project cost.

Enforcement exposure

Stop-work authority can interrupt the critical path.

When work begins without authorization, the agency may halt the site, require corrective plans, impose additional fees, withhold inspection release, or require concealed work to be exposed for review.

Closeout exposure

Unresolved work can block occupancy and utilities.

A missing final inspection or certificate can complicate occupancy, refinancing, sale, insurance, and utility connection. Preserve the approved plans and signed inspection record through closeout.

Professional field note

Treat every exemption as a narrow code exception, not a blanket waiver.

Even when a cosmetic or minor project does not require a building permit, zoning, floodplain, shoreline, historic, utility, fire, or right-of-way controls may still apply. Confirm the full jurisdictional picture before work starts.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Genesee County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 517-241-9313 (LARA BCC permits); local municipal building departments use their own numbers.

How long might review take?

N/A for plan review; LARA publishes an inspection-request response within two business days and typical inspection performance within five business days. Local municipal review times vary.

How are inspections scheduled?

Apply through the responsible local municipal building department or, where LARA has authority, through Accela or the BCC-324 form. The inspector's telephone number is provided on the issued permit; call with the job location, permit number, and contact information when work is ready. The state form says LARA will respond to an inspection request within two business days to schedule and that inspections are typically performed within five business days, subject to the schedule.

Which codes and exemptions should I review?

Michigan's current published codes for 2026 are the 2021 Michigan Building Code (effective April 9, 2025), 2015 Michigan Residential Code (still in effect while the 2021 residential update remains enjoined), 2021 Michigan Rehabilitation Code (effective April 9, 2025), 2021 Michigan Mechanical and Plumbing Codes (effective March 12, 2024), 2023 National Electrical Code with Michigan amendments (effective March 12, 2024), and 2021 Michigan Commercial Energy Code (effective April 22, 2025). Local agencies may administer these codes under their delegated authority. Michigan LARA states that ordinary repairs may be performed without a building permit when they do not cut or remove structural members or required means of egress and do not affect regulated standpipe, water, sewer, drainage, gas, electrical, mechanical, public-health, or general-safety systems. Exemptions do not authorize code-violating work. Confirm cosmetic, accessory, agricultural, and minor-work exemptions with the applicable city or township because Genesee County has no countywide building-permit program.

Why permit costs vary

The fee is tied to the work, not just the form.

Building departments commonly calculate charges from valuation, occupancy, floor area, project type, plan review effort, trade scope, state surcharges, and inspection activity. A remodel that appears small on paper may still trigger structural, energy, fire, or utility review. Ask the permit counter which disciplines apply before you finalize the construction budget.

The same discipline applies to enforcement. Correcting unpermitted work after finishes are installed can require demolition, revised plans, additional inspections, and schedule disruption. Authorization is usually the less expensive project-management decision.