Digital permit application gateway

Apply for a permit in Anne Arundel County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the Accela permitting portal.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

Typical review for a non-residential tenant-improvement permit is approximately 10 business days for each submittal after acceptance; other permit timelines vary by project and agency reviews. The county's system help notes that manager review remaining for more than five business days should be referred to the Permit Center.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

No verified form linkReview current fees ↗

Before submission, call 410-222-7730 (Permit Center); 410-222-4432 (inspection scheduling questions); 410-222-7790 (Building Inspections) if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Anne Arundel County

Who handles permitting for this jurisdiction?

Anne Arundel County Department of Inspections and Permits is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 410-222-7730 (Permit Center); 410-222-4432 (inspection scheduling questions); 410-222-7790 (Building Inspections).

How long might review take?

Typical review for a non-residential tenant-improvement permit is approximately 10 business days for each submittal after acceptance; other permit timelines vary by project and agency reviews. The county's system help notes that manager review remaining for more than five business days should be referred to the Permit Center.

How are inspections scheduled?

Schedule and track inspections in the Land Use Navigator after the permit has been active for at least 24 hours. Approved drawings and grading plans must be onsite. Trade finals must be complete before the final building inspection; for commercial or tenant-improvement work, the Fire Marshal life-safety final must also pass first. If internet scheduling is unavailable, call 410-222-7784 and listen for the dispatcher Monday-Friday, 7:30 a.m.-4:00 p.m.; Building Inspections can be reached at 410-222-7790.

Which codes and exemptions should I review?

Current for 2026: 2021 International Building Code, 2021 International Residential Code, 2021 International Energy Conservation Code, 2021 International Existing Building Code, 2021 International Swimming Pool and Spa Code, 2020 National Electrical Code, 2021 International Fuel Gas Code, 2021 International Mechanical Code, and 2021 International Plumbing Code. The county's 2024 code package is effective June 23, 2024; 2024 NFPA 1 Uniform Fire Code and 2024 NFPA 101 Life Safety Code amendments under Bill 13-26 are effective May 25, 2026. The county's project guide identifies limited exemptions: ground-level residential patios generally do not require a building permit, though grading approval may be required; detached residential decks under 200 square feet and under 3 feet high may be exempt outside the Critical Area or Bog Contribution Drainage Area; replacing roof shingles only does not require a permit; replacing or reinstalling solar panels in kind does not require a building permit, but electrical authorization may be required; detached sheds or gazebos no larger than 150 square feet and no higher than 10 feet may be exempt outside the Critical Area; and residential pools require permits only when in-ground or above-ground over 36 inches. Fences, retaining walls, decks, additions, alterations, new structures, and most commercial work generally require permits, with location and scope controlling.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.