Official fee pathway
Build the permit budget from the issuing agency’s schedule.
The final charge may depend on declared construction value, occupancy classification, square footage, plan review, state surcharges, trade permits, technology fees, and inspection activity. Do not use a neighboring city’s fee table as a substitute for this jurisdiction.
Fee desk contact
270-524-1782
Ask the counter to confirm current charges before submitting a project with multiple trades or a change of use.
Financial exposure
Budget for the complete approval path.
Plan for building, mechanical, plumbing, electrical, fire, energy, zoning, septic, right-of-way, or other reviews that the project scope triggers. The lowest initial permit fee is not always the lowest project cost.
Enforcement exposure
Stop-work authority can interrupt the critical path.
When work begins without authorization, the agency may halt the site, require corrective plans, impose additional fees, withhold inspection release, or require concealed work to be exposed for review.
Closeout exposure
Unresolved work can block occupancy and utilities.
A missing final inspection or certificate can complicate occupancy, refinancing, sale, insurance, and utility connection. Preserve the approved plans and signed inspection record through closeout.
Professional field note
Treat every exemption as a narrow code exception, not a blanket waiver.
Even when a cosmetic or minor project does not require a building permit, zoning, floodplain, shoreline, historic, utility, fire, or right-of-way controls may still apply. Confirm the full jurisdictional picture before work starts.