County Permit SearchU.S. compliance directory
← Floyd County overview

Digital permit application gateway

Apply for a permit in Floyd County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the SmartGov public portal.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

N/A. No published Floyd County, Prestonsburg, or DHBC plan-review turnaround time was found.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call 606-422-0251 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Floyd County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 606-422-0251.

How long might review take?

N/A. No published Floyd County, Prestonsburg, or DHBC plan-review turnaround time was found.

How are inspections scheduled?

For work within Prestonsburg contact local building inspector Jamie Potter at 606-422-0251. For state-jurisdiction building plan review and inspections contact Levi Wells at 606-359-4062 or matthewl.wells@ky.gov. Local electrical matters are directed to the county judge executive’s office or city office where work is performed. State electrical inspector Ron Lewis is 859-358-5982; elevator inspector Rodney Napier is 606-671-1358; HVAC inspector Billy Blair is 502-395-4879; manufactured-housing inspector Randy Jones is 606-872-9306; boiler inspector Scott Shepherd is 502-382-0545. Plumbing inspector Ricky Adams is 606-359-3850, with office hours Tuesday 8:00-9:30 a.m. EST at Floyd County Health Department, 238 Goble Street, Prestonsburg, 606-886-2788 ext. 2.

Which codes and exemptions should I review?

The current DHBC county assignment lists Jamie Potter as the local building inspector for City of Prestonsburg only and Levi Wells as the state building inspector for the remaining state jurisdiction. The applicable statewide framework is the 2018 Kentucky Building Code and 2018 Kentucky Residential Code, based on the 2015 IBC/IRC with Kentucky amendments. No newer 2026 KBC or KRC adoption was verified; DHBC announced July 2026 NEC updates for electrical work. The current assignment does not publish a Floyd County-specific minor or cosmetic exemption list. Confirm maintenance, small accessory work, agricultural work, manufactured housing, and other potentially exempt projects with the City of Prestonsburg or DHBC before beginning. Plumbing, electrical, HVAC, septic, floodplain, and zoning requirements may be separate.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.