County Permit SearchU.S. compliance directory
← Bourbon County overview

Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Bourbon County.

The local inspector administers the Kentucky Building Code and Kentucky Residential Code through the county/local building inspection program. Kentucky’s current framework is the 2018 Kentucky Building Code and 2018 Kentucky Residential Code, based on the 2015 IBC/IRC with Kentucky amendments. No newer 2026 code adoption was verified.

Inspection lane

Contact Michelle Thornsburg, Planning Administrator/Building Inspector Level II, at 859-987-2150 or mthornsburg@paris.ky.gov. The official state inspector sheet identifies her as the local building inspector for both the City of Paris and Bourbon County. Electrical inspection arrangements are made through the county judge executive’s office or the city office where work occurs; plumbing office hours are Friday 8:00-9:30 a.m. at the Bourbon County Health Department, 341 East Main Street, Paris, KY 40361, 859-298-8721.

Minor-work playbook

Understand what may be exempt—and what is not.

No county-specific minor-work exemption list was published on the verified pages. Kentucky code exemptions generally include qualifying small detached sheds/playhouses, fences up to 7 feet, retaining walls up to 4 feet, sidewalks/driveways, ordinary finish work, qualifying awnings and decks, and minor electrical, mechanical, gas, or plumbing work; confirm applicability with the local inspector. Agricultural and other exemptions may also depend on the applicable Kentucky statutes and regulations.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Contact Michelle Thornsburg, Planning Administrator/Building Inspector Level II, at 859-987-2150 or mthornsburg@paris.ky.gov. The official state inspector sheet identifies her as the local building inspector for both the City of Paris and Bourbon County. Electrical inspection arrangements are made through the county judge executive’s office or the city office where work occurs; plumbing office hours are Friday 8:00-9:30 a.m. at the Bourbon County Health Department, 341 East Main Street, Paris, KY 40361, 859-298-8721.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

No verified lookup link

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Bourbon County

Who handles permitting for this jurisdiction?

Bourbon County Joint Planning Commission / Bourbon County Planning Administrator and Building Inspector is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 859-987-2150.

How long might review take?

N/A. No published building-plan review timeline was found.

How are inspections scheduled?

Contact Michelle Thornsburg, Planning Administrator/Building Inspector Level II, at 859-987-2150 or mthornsburg@paris.ky.gov. The official state inspector sheet identifies her as the local building inspector for both the City of Paris and Bourbon County. Electrical inspection arrangements are made through the county judge executive’s office or the city office where work occurs; plumbing office hours are Friday 8:00-9:30 a.m. at the Bourbon County Health Department, 341 East Main Street, Paris, KY 40361, 859-298-8721.

Which codes and exemptions should I review?

The local inspector administers the Kentucky Building Code and Kentucky Residential Code through the county/local building inspection program. Kentucky’s current framework is the 2018 Kentucky Building Code and 2018 Kentucky Residential Code, based on the 2015 IBC/IRC with Kentucky amendments. No newer 2026 code adoption was verified. No county-specific minor-work exemption list was published on the verified pages. Kentucky code exemptions generally include qualifying small detached sheds/playhouses, fences up to 7 feet, retaining walls up to 4 feet, sidewalks/driveways, ordinary finish work, qualifying awnings and decks, and minor electrical, mechanical, gas, or plumbing work; confirm applicability with the local inspector. Agricultural and other exemptions may also depend on the applicable Kentucky statutes and regulations.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.