Codes, exemptions & field inspections

Build to the adopted code. Verify every exception.

This guide translates the available agency record into a preconstruction checklist for structural scope, minor work, and inspection release. The adopted code and the issuing official control when a field condition is disputed.

Regulatory framework

The code baseline for Martin County.

Indiana's currently effective state rules list the 2014 Indiana Building Code (2012 IBC with Indiana amendments), 2020 Indiana Residential Code (2018 IRC with Indiana amendments), 2012 Indiana Plumbing Code (2006 IPC), 2009 Indiana Electrical Code (2008 NEC), 2014 Indiana Mechanical Code (2012 IMC), 2010 Indiana Energy Conservation Code (ASHRAE 90.1-2007), 2014 Indiana Fire Code (2012 IFC), and 2014 Indiana Fuel Gas Code (2012 IFGC). Loogootee states that it enforces applicable local and state safety codes.

Inspection lane

Contact the Loogootee Building Commissioner at 812-295-1000 ext. 5 to arrange required local inspections. The city states that the office manages permits and conducts inspections. For Class 1/public-commercial projects where no approved local department has jurisdiction, contact Indiana DHS Code Enforcement at 317-232-1407.

Minor-work playbook

Understand what may be exempt—and what is not.

No specific exemption summary was verified. Ask the issuing official for written confirmation before treating minor, cosmetic, or accessory work as permit-exempt.

Field rule

A permit exemption generally addresses one narrow construction trigger. It does not automatically waive zoning, land-use, floodplain, shoreline, fire, energy, electrical, utility, septic, or right-of-way requirements. Obtain written confirmation when the project involves a new structure, structural alteration, change in occupancy, or concealed work.

Inspection pipeline

Keep the work visible at every release point.

  1. 1

    Request with lead time

    Contact the Loogootee Building Commissioner at 812-295-1000 ext. 5 to arrange required local inspections. The city states that the office manages permits and conducts inspections. For Class 1/public-commercial projects where no approved local department has jurisdiction, contact Indiana DHS Code Enforcement at 317-232-1407.

  2. 2

    Preserve access

    Do not cover framing, reinforcement, wiring, piping, damp-proofing, or life-safety work until the required inspection has been completed and documented.

  3. 3

    Close the record

    Retain the approved plans, inspection approvals, correction responses, and final certificate or occupancy release with the property file.

Contractor verification

Verify the builder before the contract is signed.

Use the state licensing system to verify active registration, trade credentials, bond status, and liability coverage where available. Match the legal business name to the proposal and permit application.

No verified lookup link

Planning reference

Keep the parcel rules beside the building plans.

A building permit is only one part of statutory compliance. Check the local zoning, ordinance, map, or land-use reference before finalizing setbacks, height, lot coverage, access, drainage, or accessory structure placement.

Open planning reference ↗

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Martin County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Loogootee Building Commissioner: 812-295-1000 ext. 5; Indiana DHS Building Plan Review: 317-232-6422.

How long might review take?

For an Indiana state construction design release, IDHS issues a release, incomplete-filing notice, or plan-review-selection notice within 10 business days. If selected for review, it issues a release or correction request within 20 business days; each corrected submission receives another response within 10 business days. No local Loogootee review time is published.

How are inspections scheduled?

Contact the Loogootee Building Commissioner at 812-295-1000 ext. 5 to arrange required local inspections. The city states that the office manages permits and conducts inspections. For Class 1/public-commercial projects where no approved local department has jurisdiction, contact Indiana DHS Code Enforcement at 317-232-1407.

Which codes and exemptions should I review?

Indiana's currently effective state rules list the 2014 Indiana Building Code (2012 IBC with Indiana amendments), 2020 Indiana Residential Code (2018 IRC with Indiana amendments), 2012 Indiana Plumbing Code (2006 IPC), 2009 Indiana Electrical Code (2008 NEC), 2014 Indiana Mechanical Code (2012 IMC), 2010 Indiana Energy Conservation Code (ASHRAE 90.1-2007), 2014 Indiana Fire Code (2012 IFC), and 2014 Indiana Fuel Gas Code (2012 IFGC). Loogootee states that it enforces applicable local and state safety codes. No specific exemption summary was verified; request written confirmation before treating work as permit-exempt.

Field sequencing matters

The inspector needs to see the work at the right moment.

Code compliance is not only a plan-review exercise. Footings, reinforcement, framing, fireblocking, wiring, piping, insulation, weather protection, and life-safety systems each have points where the work must remain accessible. Build the inspection calendar into the trade schedule instead of treating it as a final administrative step.

When a project qualifies for a narrow minor-work exemption, keep a written explanation of why it qualifies and confirm that related zoning, utility, fire, energy, or environmental rules do not create a separate approval requirement.

Closeout file

Keep the approved plan set, inspection approvals, correction responses, contractor license verification, final certificate, and any occupancy release together. A clean record protects the owner, builder, lender, insurer, and future buyer.