Digital permit application gateway

Apply for a permit in Martin County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

For an Indiana state construction design release, IDHS issues a release, incomplete-filing notice, or plan-review-selection notice within 10 business days. If selected for review, it issues a release or correction request within 20 business days; each corrected submission receives another response within 10 business days. No local Loogootee review time is published.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call Loogootee Building Commissioner: 812-295-1000 ext. 5; Indiana DHS Building Plan Review: 317-232-6422 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Martin County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Loogootee Building Commissioner: 812-295-1000 ext. 5; Indiana DHS Building Plan Review: 317-232-6422.

How long might review take?

For an Indiana state construction design release, IDHS issues a release, incomplete-filing notice, or plan-review-selection notice within 10 business days. If selected for review, it issues a release or correction request within 20 business days; each corrected submission receives another response within 10 business days. No local Loogootee review time is published.

How are inspections scheduled?

Contact the Loogootee Building Commissioner at 812-295-1000 ext. 5 to arrange required local inspections. The city states that the office manages permits and conducts inspections. For Class 1/public-commercial projects where no approved local department has jurisdiction, contact Indiana DHS Code Enforcement at 317-232-1407.

Which codes and exemptions should I review?

Indiana's currently effective state rules list the 2014 Indiana Building Code (2012 IBC with Indiana amendments), 2020 Indiana Residential Code (2018 IRC with Indiana amendments), 2012 Indiana Plumbing Code (2006 IPC), 2009 Indiana Electrical Code (2008 NEC), 2014 Indiana Mechanical Code (2012 IMC), 2010 Indiana Energy Conservation Code (ASHRAE 90.1-2007), 2014 Indiana Fire Code (2012 IFC), and 2014 Indiana Fuel Gas Code (2012 IFGC). Loogootee states that it enforces applicable local and state safety codes. No specific exemption summary was verified; request written confirmation before treating work as permit-exempt.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.