County Permit SearchU.S. compliance directory
← Solano County overview

Digital permit application gateway

Apply for a permit in Solano County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the Accela permitting portal.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

N/A; the County explains that plan review begins after electronic submittal and payment of plan-check fees, but does not publish a standard review duration. Timing varies by project type, completeness, corrections, and agency requirements.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call (707) 784-6765; 24-hour inspection request line (707) 784-4750 if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Solano County

Who handles permitting for this jurisdiction?

Solano County Department of Resource Management - Building & Safety Services is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (707) 784-6765; 24-hour inspection request line (707) 784-4750.

How long might review take?

N/A; the County explains that plan review begins after electronic submittal and payment of plan-check fees, but does not publish a standard review duration. Timing varies by project type, completeness, corrections, and agency requirements.

How are inspections scheduled?

Call the 24-hour inspection request line at (707) 784-4750 and leave the permit number, job-site address, inspection type, and callback number. Requests made before 3:00 p.m. are scheduled for the following business day; later requests are scheduled two business days later. Specific times cannot be requested. Keep approved plans and the permit card on site, and do not cover work before inspection.

Which codes and exemptions should I review?

Solano County's current requirements page lists the 2025 California Building Code, 2025 California Residential Code, 2025 California Mechanical Code, 2025 California Electrical Code, 2025 California Plumbing Code, 2025 California Fire Code, 2025 California Energy Code, 2025 California Green Building Standards Code, 2025 California Wildland-Urban Interface Code, and 2025 California Existing Building Code, with applicable County ordinances and fire-hazard-severity-zone requirements for unincorporated areas. Under the County's CBC Section 105.2 guidance, exemptions include one-story detached accessory sheds/storage buildings/playhouses up to 120 sq. ft. with no utilities; fences up to 6 ft.; oil derricks; retaining walls up to 4 ft. measured from footing bottom unless supporting surcharge or certain liquids; grade-supported water tanks up to 5,000 gallons at no more than a 2:1 height-to-width/diameter ratio (piping and electrical still require permits); qualifying sidewalks and driveways no more than 30 inches above grade; painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work; temporary stage sets; qualifying above-ground prefabricated pools under 24 inches deep and 5,000 gallons; agricultural/nursery shade-cloth structures without service systems; residential playground equipment; qualifying wall-supported window awnings projecting no more than 54 inches; and movable fixtures/cases/racks/counters/partitions no higher than 5 ft. 9 in. Commercial or industrial counters still require permits.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.