Digital permit application gateway

Apply for a permit in Pima County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the Accela permitting portal.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

Published building-permit review goals are 5 business days for residential and commercial projects up to 20,000 square feet, 10 business days for larger projects, 3 days for off-model-plan permits, 1 day for electric reconnect/mechanical/plumbing permits, 3 days for corrected-project rereviews, and 3 days for issued-permit revisions. For site-development instruments, the county strives for 5 business days and guarantees a 15-business-day review timeframe; exceptional complexity or high activity can extend the goals.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

No verified form linkReview current fees ↗

Before submission, call 520-724-9000 (Development Services); 520-724-9970 (building-code/code-compliance complaints); 520-419-2355 or 520-235-4600 (custom or same-day inspections) if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Pima County

Who handles permitting for this jurisdiction?

Pima County Development Services Department, Building and Site Development Division (unincorporated county jurisdiction) is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 520-724-9000 (Development Services); 520-724-9970 (building-code/code-compliance complaints); 520-419-2355 or 520-235-4600 (custom or same-day inspections).

How long might review take?

Published building-permit review goals are 5 business days for residential and commercial projects up to 20,000 square feet, 10 business days for larger projects, 3 days for off-model-plan permits, 1 day for electric reconnect/mechanical/plumbing permits, 3 days for corrected-project rereviews, and 3 days for issued-permit revisions. For site-development instruments, the county strives for 5 business days and guarantees a 15-business-day review timeframe; exceptional complexity or high activity can extend the goals.

How are inspections scheduled?

Schedule routine field or remote inspections through Pima County’s Building Inspection Portal powered by VuSpex; check permit conditions/status in Accela first and keep the site address posted with access directions or gate codes. Schedule before 4:00 p.m. for next-business-day inspections when available. Remote inspections may be used for eligible projects; Ajo/Why/Lukeville are limited to Tuesdays, Arivaca/Sasabe to Wednesdays, and Mt. Lemmon to Thursdays for on-site visits. Custom, weekend, specific-time or same-day requests use 520-419-2355 or 520-235-4600 and may incur an additional charge.

Which codes and exemptions should I review?

Current Pima County materials effective in 2026 identify the 2024 International Building, Residential, Mechanical, Plumbing, Fuel Gas, Property Maintenance, Existing Building, Swimming Pool and Spa, and Wildland-Urban Interface Codes with local amendments; the 2024 International Energy Conservation Code with local amendments applies to permit applications initiated on or after July 1, 2026; and the 2023 National Electrical Code is enforced. The Wildland-Urban Interface Code is limited to Rural Forest Village areas. Pima County examples of exempt minor work include attic insulation without remodeling; new carpet; nonstructural decks or flat work no more than 30 inches above adjacent grade when not over a basement/story or part of an accessible route; door, window, rain-gutter and like-material reroofing work; painting, tiling, carpeting, cabinets and countertops that do not affect plumbing or electrical; qualifying slabs; non-retaining fences/walls up to 7 feet; qualifying window awnings; portable or like-for-like cooling/heating equipment; limited low-voltage electrical work and like-for-like outlets/fixtures; plumbing leak or stoppage repairs and fixture replacements; qualifying water tanks; movable fixtures/partitions; and playground equipment. Other structural, addition/remodel, new-system, pool, grading, hillside, floodplain, septic, electrical-wiring and utility work may still require permits or separate approvals; the county’s list is illustrative and site conditions can trigger additional requirements.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.