Apply for a permit in Navajo County

Start with the issuing authority’s own submission lane. A complete application package, accurate valuation, and accessible inspection path are the fastest route through statutory plan review.

Recommended first click

Open the official online permit gateway.

Use the official digital gateway to submit plans, monitor review comments, pay required charges, and request inspections when the permit is issued. If the link is unavailable, use the agency website or phone number on the administrative profile to confirm the current lane.

Typical review lane

N/A. The current public building materials state inspection notice expectations but do not publish a standard building-plan review turnaround. Permits become void unless work starts within six months or is suspended/abandoned for one year; reactivation is listed at 10% of the original fee.

Treat this as a planning signal, not a guaranteed approval date. Completeness, corrections, resubmittals, and agency workload control the actual clock.

01

Confirm jurisdiction

Verify the parcel is inside this agency’s service area and note whether a city, state, fire marshal, septic authority, or utility district also has approval authority.

02

Assemble a complete package

Prepare legible plans, site information, project valuation, ownership authorization, contractor information, and any energy, floodplain, zoning, or utility documentation the issuing office requires.

03

Track the review record

Keep the permit number, approved plan set, correction comments, fee receipts, and inspection results together. Those records establish the compliance trail for the next trade.

Application documents

Use the official form when a portal is not the only filing route.

Before submission, call 928-532-6040 (Building Division/Planning and Development Services); 928-524-4100 (Holbrook county complex) if the project involves a change of occupancy, structural alteration, accessory structure, demolition, or work near a regulated environmental feature.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Navajo County

Who handles permitting for this jurisdiction?

Navajo County Planning and Development Services Department / Building Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 928-532-6040 (Building Division/Planning and Development Services); 928-524-4100 (Holbrook county complex).

How long might review take?

N/A. The current public building materials state inspection notice expectations but do not publish a standard building-plan review turnaround. Permits become void unless work starts within six months or is suspended/abandoned for one year; reactivation is listed at 10% of the original fee.

How are inspections scheduled?

Inspections are required for all construction phases, including footings, foundations, under-floor, framing, shear wall, roof sheathing, electrical, plumbing, drywall, meter loop, gas, septic and signs. Request an inspection from the Building Department number printed on the permit, providing permit number, permit-holder name, inspection type, site address and responsible-person phone; inspections generally require 24-hour notice Monday-Friday. Lines must meet the county’s published gas, water and wastewater test conditions, and all utilities must work for final inspection.

Which codes and exemptions should I review?

Navajo County publishes the 2018 International Residential Code, 2018 International Building Code, Navajo County Addenda and Additions, and a 2006 IRC stair-building reference; the county’s construction materials also require applicable Arizona Administrative Code Title 18 requirements for environmental/septic work. The reviewed current county materials did not publish a complete cosmetic-work exemption table. They state that accessory buildings with electrical, plumbing or other utilities require a building permit regardless of size; agricultural, zoning and other exemptions may require separate county applications. Minor work exemptions should be confirmed with the Building Division before construction.

What makes an application complete

A portal submission is only as strong as its supporting record.

Before you click submit, make sure the drawings agree with the site plan, project description, valuation, ownership authorization, and contractor information. If the work changes structure, occupancy, drainage, fire protection, energy performance, or utility demand, describe that scope plainly. Ambiguous narratives create correction cycles and delay the field schedule.

Save the confirmation number, payment receipt, uploaded plan set, and every correction comment. Those records are the backbone of a defensible compliance file when multiple trades or agencies share responsibility.

Submission quality check

Site: address, parcel, access, setbacks, and existing conditions are consistent.

Scope: structural, mechanical, plumbing, electrical, fire, and energy work is identified.

Closeout: inspection contacts and the final approval path are understood before work begins.