Fees, valuation & enforcement

Know the cost of authorization—and the cost of skipping it.

Permit fees are a project input. Enforcement exposure is a project risk. Use the official schedule where available, then confirm valuation, trade permits, plan review, and inspection charges with the Authority Having Jurisdiction.

Official fee pathway

Build the permit budget from the issuing agency’s schedule.

The final charge may depend on declared construction value, occupancy classification, square footage, plan review, state surcharges, trade permits, technology fees, and inspection activity. Do not use a neighboring city’s fee table as a substitute for this jurisdiction.

Fee desk contact

307-777-7288; Goshen County Planner & GIS 307-532-3852

Ask the counter to confirm current charges before submitting a project with multiple trades or a change of use.

Financial exposure

Budget for the complete approval path.

Plan for building, mechanical, plumbing, electrical, fire, energy, zoning, septic, right-of-way, or other reviews that the project scope triggers. The lowest initial permit fee is not always the lowest project cost.

Enforcement exposure

Stop-work authority can interrupt the critical path.

When work begins without authorization, the agency may halt the site, require corrective plans, impose additional fees, withhold inspection release, or require concealed work to be exposed for review.

Closeout exposure

Unresolved work can block occupancy and utilities.

A missing final inspection or certificate can complicate occupancy, refinancing, sale, insurance, and utility connection. Preserve the approved plans and signed inspection record through closeout.

Professional field note

Treat every exemption as a narrow code exception, not a blanket waiver.

Even when a cosmetic or minor project does not require a building permit, zoning, floodplain, shoreline, historic, utility, fire, or right-of-way controls may still apply. Confirm the full jurisdictional picture before work starts.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Goshen County

Who handles permitting for this jurisdiction?

This record is marked State Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 307-777-7288; Goshen County Planner & GIS 307-532-3852.

How long might review take?

The State Fire Marshal accepts or rejects a plan-review submission for review within five business days and completes review of a complete accepted submittal within 21 business days; resubmittals are reviewed within 10 business days after receipt or the original 21-day period, whichever is later. Goshen County generally reviews a complete conventional septic application within one to two business days.

How are inspections scheduled?

Goshen County performs no general building inspections. For a guaranteed state electrical inspection in Goshen County, obtain the wiring permit through the state portal and contact State Electrical Inspector Brian Keithly at 307-254-1081. State fire/life-safety plan-review projects receive construction inspections and must pass before a Certificate of Occupancy or Letter of Compliance. For a County septic inspection, contact Rachelle Anderson at 307-532-4868 with at least 48 hours' notice and leave the tank piping, building-to-tank pipe, distribution box and entire leachfield visible.

Which codes and exemptions should I review?

Goshen County's official Planning & GIS page states that the County currently has no zoning regulations or building inspections. For projects within Wyoming State Fire Marshal jurisdiction, the state enforces the 2024 International Fire Code, 2024 International Building Code, 2024 International Fuel Gas Code, 2024 International Mechanical Code, 2024 International Existing Building Code and, effective July 1, 2026, the 2026 National Electrical Code. County small-wastewater, floodplain, subdivision, road-work and special-use regulations apply separately when relevant. N/A for a county building permit because Goshen County does not operate a general building-inspection program or zoning regulations. State Fire Marshal plan review is limited to specified public and life-safety projects, including government buildings, schools, public-access buildings over 5,000 square feet, larger child-care facilities, multistory and assembly occupancies, qualifying remodels and occupancy changes, fire-protection systems, alternative energy, aboveground fuel tanks, commercial kitchen hoods, spray-finishing operations and RV/camping/mobile-home park site plans. Other private work may still require a state electrical permit or separate County septic, floodplain, subdivision, road or special-facility permit.

Why permit costs vary

The fee is tied to the work, not just the form.

Building departments commonly calculate charges from valuation, occupancy, floor area, project type, plan review effort, trade scope, state surcharges, and inspection activity. A remodel that appears small on paper may still trigger structural, energy, fire, or utility review. Ask the permit counter which disciplines apply before you finalize the construction budget.

The same discipline applies to enforcement. Correcting unpermitted work after finishes are installed can require demolition, revised plans, additional inspections, and schedule disruption. Authorization is usually the less expensive project-management decision.